Skip to main content
Apollo NZ GlobalStart Project Brief
ATHREN — Sports & Flooring Systems

ATHREN FIELD · Hockey Facility Systems

Build the hockey field as a complete facility — not just a turf order.

ATHREN FIELD brings the hockey playing surface into a wider project pathway covering the field system, base and drainage interfaces, goals and perimeter, lighting, player and spectator infrastructure, operations and maintenance. The surface is selected around the required level of play and exact current system evidence; the surrounding facility package is coordinated around the site and operating brief.

Dry · Elite · Club · Community · Hockey5sSurface + field infrastructureProject-specific certification pathwayGlobal supply-only project coordination
Modern synthetic hockey field with pavilion, player shelters, perimeter and sports lightingIllustrative ATHREN FIELD facility concept. Final field system, infrastructure and certification pathway are project-specific.

Field to facility

Resolve the field in the right order.

A hockey project works best when the playing requirement, civil interfaces and supporting infrastructure are considered before the product package is frozen.

01 · 01

Define the hockey programme

Competition level, training use, schools or community access, Hockey5s requirements, operating hours and any federation or tender criteria.

02 · 02

Select the field system

Choose the appropriate dry, high-performance, club or shared-use surface pathway and confirm the exact turf, shockpad, seams, line marking and current evidence.

03 · 03

Coordinate the infrastructure

Resolve base, drainage, irrigation where applicable, goals, perimeter, ball-stop systems, lighting, shelters, seating, technology and maintenance access.

04 · 04

Freeze the supply brief

Confirm supplied products, technical documents, freight, local installation responsibilities, field testing and destination approvals before order.

Apollo supplies the agreed project package. Civil works, foundations, electrical work, local installation, field testing and statutory approvals remain separate project responsibilities unless expressly included.

Product details

Complete hockey facility building blocks

The final package depends on the field level, site and operating model. These are the project interfaces Apollo can coordinate around the selected ATHREN FIELD surface.

01Playing surface
Dry · Elite · Club · Community · Hockey5sThe exact turf and performance pathway are selected against current product/system evidence and the intended level of play.
02Shockpad / elastic layer
System-specificIncluded only where required by the tested construction or project brief; material, thickness and performance remain exact-system dependent.
03Base interface
Project-specific civil designSub-base, asphalt or other base construction, tolerances and falls must be resolved by the project team against the selected field system.
04Drainage
Surface + sub-surface strategyDrainage capacity, outlets, falls and local rainfall conditions are coordinated before the turf package is frozen.
05Irrigation
None / project-specificDry systems are reviewed separately from water-based hockey pathways. Any irrigation requirement must match the exact selected system.
06Goals & field equipment
Competition · club · trainingGoals, anchoring, storage and related field equipment are selected around the facility programme and applicable requirements.
07Perimeter & ball-stop
Fencing · gates · high ball-stop zonesHeight, mesh, gate positions, spectator separation and impact zones are planned around field geometry and neighbouring uses.
08Sports lighting
Project photometric designPole positions, optics, glare, uniformity, switching and operating levels are coordinated around the actual field and destination requirements.
09Players & officials
Shelters · benches · technical areasPlayer, official and equipment zones are coordinated with sidelines, access, safety clearances and field operations.
10Spectators
Bleachers · grandstands · accessible viewingSpectator capacity and format scale from small club seating to structural grandstand packages.
11Technology
Scoreboards · cameras · connectivityTechnology is scoped separately around competition, coaching, streaming, scoring and venue-operation requirements.
12Maintenance
Surface-specific programmeBrushing, cleaning, infill management where applicable, inspection and maintenance equipment must match the exact turf system.
13Supply model
Supply onlyApollo coordinates product supply and documentation; local civil, electrical, installation, testing and approval scopes are separated clearly.

Exact turf construction, shockpad, base requirements, drainage, irrigation, federation documentation, warranty and maintenance requirements are confirmed against the selected system before quotation. Surrounding facility products are also selected project by project. Apollo NZ Global is supply-only.

Complete hockey facility

Connect the surface to the systems around it.

Use the ATHREN FIELD surface page for the turf pathway, then coordinate the wider Apollo sports platform around the actual hockey facility.

Applications + project fit

A complete-field brief reduces the gaps between the products.

Dry hockey pathway

Non-irrigated hockey is treated as its own performance pathway, not as a marketing variation of a conventional field. Exact current system evidence is confirmed before specification.

Certification stays attached to the exact system

Where FIH requirements apply, the supplier product, complete construction and finished-field pathway are checked individually. ATHREN branding does not replace or transfer certification.

Base and drainage come before turf

A premium surface cannot correct unsuitable levels, drainage or civil construction. The field platform is resolved before the surface package is finalised.

Infrastructure is planned with the field

Goals, fencing, lighting, shelters, spectators and technology influence clearances, underground services, access and operations, so they should not be treated as late add-ons.

Schools and clubs can stage the project

Core field works can be prioritised first, with seating, technology, larger spectator infrastructure or other amenity systems staged where the site and budget allow.

International supply remains practical

Freight, packing, receiving, local installer capability, documentation and destination requirements are considered before the package is released for manufacture.

Applications
Elite and competition hockeyHockey clubsSchools and academiesCommunity sports facilitiesHockey5sTraining centresMulti-field sports precinctsInternational sports projects
Product snapshot

ATHREN FIELD Hockey Facility Systems

Complete hockey facility pathway connecting dry, elite, club, community and Hockey5s surface selection with base and drainage interfaces, goals, perimeter and ball-stop systems, sports lighting, player shelters, spectator infrastructure, sports technology and maintenance planning. Exact turf system, certification, civil design and field testing remain project-specific. Apollo NZ Global is supply-only.

ATHRENSports Surfaces & FlooringLive product pathway
Applications

Clubs Sports Venues

Configuration

Project Configured

TechnicalTechnical documents not yet centralisedDrawingsDrawing review by projectRegionalGlobal project reviewRelated0 controlled pathwaysSupply modelSupply-only · manual project quotation

This snapshot summarises the current Apollo product record. Final configuration, interfaces, engineering, certification and destination requirements are confirmed against the project.

Project planning

Useful product details at a glance.

Product information
Project checkTechnical Review Required

Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.

Build project brief

Final engineering, testing, approvals and destination requirements are confirmed for the actual project where applicable.

Connected project pathway

Everything you need to take the next project step.

ATHREN · Sports & Flooring Systems
Related pathwayProject Upload Tool

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Apollo NZ Global

Global products. Global projects. Practical supply solutions.
Apollo NZ Global is supply-only unless a written project scope states otherwise.

sales@apollonzglobal.com
Project