Skip to main content
ZAHREQARCHITECTURAL MEMBRANE SYSTEMSStart project
Architectural tensile membrane structure for Oman project context

ZAHREQ · OMAN

Architectural Membrane Systems for Oman

Engineered membrane structures for coastal resorts, public spaces, transport and destination developments across Oman.Start Oman project

PROJECT APPLICATIONS

Where ZAHREQ fits.

Coastal resort structuresAirport and transport canopiesPublic realm and civic shadeCommercial parking structuresSports and leisure facilitiesLandmark tourism architecture

DESIGN BASIS

Site-specific engineering comes first.

Every ZAHREQ project is assessed around location, wind code, terrain, building height, surrounding conditions, membrane geometry, fire requirements, structural interfaces and intended design life. No universal catalogue wind rating is substituted for the project design basis.

COASTAL / CORROSION

Protection matched to exposure.

Oman's coastal and saline environments require careful steel and hardware specification. Hot-dip galvanising, duplex coating and 316 / 316L exposed hardware can be considered project by project.

LOCAL ENGINEERING

Authority pathway stays local.

Project structural documentation and local engineer coordination are developed around the required Oman authority pathway and project design basis.

PTFEPremium long-life permanent membrane pathway.
PVDFCommercial architectural membrane pathway.
ETFESpecialist transparent single-layer or cushion pathway for significant projects.

PROJECT SUPPLY

Manufactured internationally. Delivered into the local project team.

Apollo NZ Global is a supply-only wholesale and project-supply company. Local approvals, foundations, civil works, local engineer certification and installation remain project-specific unless expressly included in writing. Supplier site supervision can be scoped where required.

START THE REVIEW

Send the design basis.

Share the site, drawings, required span, use, known wind/fire criteria, coastal exposure and programme so the correct membrane and structural pathway can be reviewed.

Start project review
Project