Corrosion environment
Material selection, coatings, galvanising and maintenance strategy must be matched to the actual internal and external exposure.
ZABALERA · AQUATIC CENTRES
Large-span roof and building structures for competition, community, training and leisure aquatic facilities. Humidity, condensation, chloride exposure, ventilation interfaces, maintenance access and protective systems are treated as design inputs rather than assumptions.

APPLICATIONS
PROJECT PRIORITIES
Material selection, coatings, galvanising and maintenance strategy must be matched to the actual internal and external exposure.
Roof build-up, thermal bridges, ventilation and drainage interfaces should be coordinated with the building-services design.
Pool dimensions, deck widths, spectator zones, plant interfaces and roof supports all affect the structural brief.
Inspection, cleaning, coating maintenance and access to roof or suspended systems should be considered before fabrication.
STRUCTURAL PATHWAYS
Final system selection and practical span remain project-specific. ZABALERA does not present a single generic structure as suitable for every site or application.
CONNECTED APOLLO SYSTEMS
Apollo NZ Global is a wholesale and project-supply company. Exact design code, calculations, foundations, local approvals, civil works, erection, commissioning and statutory sign-off remain project-specific and are undertaken or approved by the appropriately qualified project parties unless expressly included in the agreed scope.
START WITH THE BRIEF