Skip to main content
Apollo NZ GlobalBack to hall matrix
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

COMPLETE VOLLEYBALL HALL SYSTEMS

LUTHVAR · VOLLEYBALL HALL PROJECT BRIEF

Build the Volleyball hall around the complete playing volume.

Coordinate court count, free-zone pathway, clear height, posts, ATHREN floor, dividers, FÍSVOR, spectators, lighting and storage before exact products are frozen.

LUTHVAR VOLLEYBALL · HALL PROJECT BRIEF

Define the playing volume before the equipment schedule.

Set the hall pathway, court count, competition level, clear height, posts, floor, dividers, spectators and storage so Apollo can coordinate the complete Volleyball system before quotation.

Hall systems to coordinate

BRIEF PREVIEW

What Apollo receives.

LUTHVAR COMPLETE VOLLEYBALL HALL PROJECT BRIEF

Hall pathway: School & Training Hall
Use / competition level: Club / league
Client / organisation: Not supplied
Destination: Not supplied
Project stage: New hall / major redevelopment
Court count / operating mode: 1 main court + training conversion
Hall dimensions / footprint: Not supplied
Clear height / overhead constraints: Not supplied
Post pathway: Recommendation required
Floor pathway: ATHREN recommendation required
Divider strategy: Divider strategy to be recommended
Target spectator capacity: Not supplied
Storage / changeover requirements: Not supplied
Target timing: Not supplied

Requested hall systems:
• Court + free-zone planning — LUTHVAR
• ATHREN floor + socket interfaces — ATHREN
• Posts + bases / sockets — LUTHVAR
• Net + antennae + tensioning — LUTHVAR
• Post padding + referee stand — LUTHVAR
• Warm-up / secondary court provision — LUTHVAR
• Divider curtains / court zoning — HLJÓÐ / LUTHVAR
• Scoreboard + game control — FÍSVOR
• Main video / LED + repeater displays — FÍSVOR
• Sports / event lighting — LUTHVAR PROJECT
• Team benches + spectator seating — HLJÓÐ / LUTHVAR
• PA / venue audio + control — HLJÓÐ
• Equipment storage + operations — LUTHVAR

Additional notes: None supplied

Apollo review required before quotation: exact governing-body / event pathway; court and free-zone requirements; clear playing volume; post/socket loads; floor build-up; divider conflicts; lighting; scorer / FÍSVOR; spectators; structure; electrical/data; fire/accessibility; freight, unloading, installation, testing and handover.
Project