LUTHVAR · WEIGHTLIFTING · TECHNICAL DIAGRAM PACK

Four vector planning sheets for weightlifting facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Weightlifting planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-WEIGHTLIFTING
SPORTWeightlifting
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · FACILITY-SYSTEM PLANNING PLANWeightlifting platform + warm-up system diagram01Competition / training platforms02Bars / discs / collars03Warm-up platforms04Equipment storageNO SINGLE UNIVERSAL RECTANGLE IS SHOWN FOR THIS FACILITY TYPE.01 · Platform count and warm-up layout depend on training or competition operation.02 · Slab, impact and acoustic performance are building-specific and should not be inferred from floor covering alone.03 · Athlete, officials, equipment and spectator circulation should be separated around competition platforms.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONPlatform + impact / slab sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYPlatform, impact flooring, slab, vibration and event sightlines
Training and competition lifting systems transmit high dynamic loads; floor build-up, slab response, warm-up, lighting and spectator interfaces require project-specific coordination.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentWeightliftingPLAYING / PERFORMANCE CORE01
Competition / training platforms
02
Bars / discs / collars
03
Warm-up platforms
04
Equipment storage
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYAttempt board / scoring · TimingCOORDINATION NOTESCompetition perimeter · Athlete / officials separation · Attempt board / scoring · TimingFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project