Weightlifting
Facility Specification Pack

Weightlifting venues need to separate competition platform geometry, warm-up, impact/noise control, equipment handling, athlete flow, scoring and spectator/event systems. Heavy drop loads and vibration also make the building interface critical.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERWeightlifting Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/club strength area with durable impact flooring and supervised lifting zones.

02Clubs · academies · universities

Club / academy

Performance/academy room with multiple platforms, racks, storage and coaching circulation.

03Regional · national competition

Competition

Competition-capable venue with exact IWF platform/equipment/event requirements and warm-up.

04International · professional · broadcast

Elite / major venue

Major event / high-performance centre with competition stage, spectators, display, media and athlete services.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Separate lifting platforms, warm-up, athlete circulation, officials and spectator/event zones from general gym traffic.

02

surface

Impact flooring and platforms must be selected around drop load, structural slab, vibration/acoustic goals and equipment stability.

03

equipment

Bars, discs, collars, racks, platforms, chalk/storage and competition equipment need exact certification/evidence where required.

04

lighting

Provide strong uniform visibility on platform and warm-up zones without glare to lifters, officials or cameras.

05

spectators

Maintain athlete/official routes, platform separation and safe spectator viewing around the competition area.

06

structure

Slab capacity, vibration, acoustic transmission and any stage/platform build-up require project-specific structural review.

07

environment

Temperature, ventilation, chalk/dust control and humidity affect athlete comfort, corrosion and cleaning.

08

accessibility

Accessible training/event circulation and spectator positions should be integrated with heavy-equipment handling routes.

09

storage

Bars, discs, racks, collars, spare equipment and transport cases require secure, high-load storage near the lifting zones.

10

technology

Scoring, attempt boards, timing, FÍSVOR, cameras and event control should be coordinated with officials and sightlines.

11

evidence

Use the current IWF Technical and Competition Rules & Regulations for event requirements; product certification and building design remain separate.

12

lifecycle

Inspect platforms, impact flooring, bars/discs/collars, racks, fasteners, scoring equipment and storage systems; track damaged high-load components.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Training / competition use

02

Platform count

03

Slab / structure

04

Impact / acoustic target

05

Platform / flooring system

06

Competition equipment

07

Warm-up

08

Lighting

09

Scoring / display

10

Spectators

11

Storage

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Platform / warm-up plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Floor build-up / slab section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Equipment layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Athlete / official circulation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Spectator layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Power/data / scoring plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Storage plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Platforms

02

Impact flooring

03

Bars/discs/collars

04

Racks

05

Fasteners

06

Scoring/displays

07

Storage

08

Chalk/dust cleaning

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Excess vibration/noise

Review slab, platform/underlay build-up, drop zones and adjacent structure.

02

Platform movement

Inspect base flatness, fixings and platform construction.

03

Floor damage

Review drop loads, tile/mat condition and equipment use.

04

Bar/equipment wear

Inspect sleeves, bearings, knurling, collars and damaged discs.

05

Chalk dust accumulation

Review cleaning/ventilation and storage practice.

06

Competition flow conflicts

Review athlete, officials, warm-up and platform circulation.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

IWF Technical & Competition Rules and Regulations

Current IWF download centre lists the Technical and Competition Rules & Regulations as of 5 November 2025.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project