Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · VOLLEYBALL · TECHNICAL DIAGRAM PACK

Four vector planning sheets for volleyball facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Volleyball planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-VOLLEYBALL
SPORTVolleyball
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANVolleyballPLAYING AREA24 m PLANNING ENVELOPE15 m PLANNING ENVELOPE18 × 9 m playing-area baselineBASIS18 × 9 m court with a 3 m general free-zone planning allowance on all sides.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONFree-playing-volume sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGY7 m minimum general unobstructed height reference
Higher competition levels require greater clear height and free zone; roof services must stay outside the required playing volume.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentVolleyballPLAYING / PERFORMANCE CORE01
Posts / sockets or bases
02
Referee stand
03
Team benches
04
Scorer table
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScoreboard · Match controlCOORDINATION NOTESFree-zone edge · Officials separation · Scoreboard · Match controlFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project