Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · TENNIS · TECHNICAL DIAGRAM PACK

Four vector planning sheets for tennis facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Tennis planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-TENNIS
SPORTTennis
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANTennisPLAYING AREA36.58 m PLANNING ENVELOPE18.29 m PLANNING ENVELOPE23.77 × 10.97 m playing-area baselineBASIS23.77 × 10.97 m doubles court with an editable 120 × 60 ft-style planning envelope.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONCourt + fence / light-pole sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYRun-off, fencing, lighting and windscreen coordination
Pole foundations, fence loads, sun orientation and drainage should be resolved with the court base.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentTennisPLAYING / PERFORMANCE CORE01
Net posts / centre strap
02
Umpire chair
03
Player benches
04
Maintenance access
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScore display · Cameras / analysisCOORDINATION NOTESBaseline / sideline viewing · Covered seating · Score display · Cameras / analysisFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project