Tennis
Facility Specification Pack

A court-construction and facility-planning resource for clubs, academies, schools, resorts and competition venues, connecting the playing surface to pace, base, drainage, lighting, fencing and operations.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERTennis Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

Durable school/community court with simple operations and maintenance.

02Clubs · academies · universities

Club / academy

Club/academy court bank with coaching, lighting, fencing, player and spectator support.

03Regional · national competition

Competition

Competition court with controlled surface pace, equipment, officials and event layout.

04International · professional · broadcast

Elite / major venue

Tournament venue with recognised-court pathway, show-court spectators, media, player services and broadcast infrastructure.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Use the 23.77 m playing length with singles/doubles widths as the playing rectangle only; run-off, fencing, lighting, player areas and spectator circulation determine the real site footprint.

02

surface

Compare hard acrylic, cushioned acrylic, turf and other recognised surface families around court pace, athlete comfort, base, drainage, climate and maintenance.

03

equipment

Net, posts, centre strap/anchor, umpire chair and court furniture should be selected around competition level and whether posts are permanent, socketed, removable or mobile.

04

lighting

Court-bank lighting needs glare control, uniformity and pole locations that do not conflict with play, fencing or spectator sightlines.

05

spectators

Plan player benches, officials, viewing, covered seating and accessible circulation without compromising run-off or court maintenance access.

06

structure

Resolve asphalt/concrete base, joints, cracking, net-post sockets, fence posts, lighting foundations, shade/cover and local wind/seismic requirements.

07

environment

Sun orientation, wind, heat, rain, coastal exposure and nearby trees/buildings influence playing comfort and maintenance.

08

accessibility

Accessible approach, gates, spectator positions and player/community-use planning should be incorporated at layout stage.

09

storage

Maintenance equipment, ball carts, portable posts, windscreens, umpire chairs and tournament equipment need dedicated storage.

10

technology

Scoreboards, line-calling/player-analysis systems, cameras, booking/access and FÍSVOR club displays can be layered into larger facilities.

11

evidence

ITF surface classification is a pace classification, not blanket product endorsement. Recognised Court and exact product / installation evidence should be kept distinct.

12

lifecycle

Track cracks, coating wear, court pace/texture, drainage, net-post sleeves, fencing, windscreens and lighting; programme resurfacing before play quality deteriorates.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Court count

02

User / competition level

03

Playing surface family

04

Desired court pace

05

Base type / condition

06

Drainage

07

Net/post system

08

Fencing / windscreens

09

Lighting

10

Shade / cover

11

Spectator / club amenities

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Court + runoff plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Base and drainage section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Net-post socket detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Fence/gate layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Multi-court circulation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Spectator / shade plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Maintenance access plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Surface clean

02

Crack/joint survey

03

Drainage clean

04

Net/post hardware check

05

Windscreen inspection

06

Fence/gate check

07

Lighting maintenance

08

Resurfacing / pace review

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Cracking

Identify structural/base movement, joints, root/heave or drainage cause before surface repair.

02

Ponding

Survey levels and drainage; coatings cannot correct major base depressions.

03

Court feels too fast/slow

Review surface texture/build-up, contamination, wear and current pace classification evidence.

04

Wind affects play

Review windscreen porosity, fence loads and local wind paths.

05

Lighting glare

Review pole position, fixture aiming, height and surface reflections.

06

Net height inconsistent

Check post/sleeve alignment, net cable, centre strap and anchor.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

ITF Tennis Tech Resources

2026 technical booklet, surface programmes, recognised courts, construction and test resources.

ITF Classified Surfaces

Current Court Pace Classification programme and five pace categories.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project