Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · LACROSSE · TECHNICAL DIAGRAM PACK

Four vector planning sheets for lacrosse facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Lacrosse planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-LACROSSE
SPORTLacrosse
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANLacrossePLAYING AREA78 m PLANNING ENVELOPE44 m PLANNING ENVELOPE70 × 36 m playing-area baselineBASISWorld Lacrosse Sixes uses a 70 × 36 m field for recognised events; the 78 × 44 m envelope adds an editable 4 m conceptual…
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONField edge + containment sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYGoals, team zones, ball containment and spectator separation
Field, Box and Sixes lacrosse require different geometry; the selected discipline controls goals, containment, benches, lighting and spectator relationships.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentLacrossePLAYING / PERFORMANCE CORE01
Goals + nets
02
Team / penalty areas
03
Ball containment
04
Equipment / storage
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScore / time · Penalty clocksCOORDINATION NOTESSafety envelope · Team / spectator separation · Score / time · Penalty clocksFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project