Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · HOCKEY · TECHNICAL DIAGRAM PACK

Four vector planning sheets for hockey facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Hockey planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-HOCKEY
SPORTHockey
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANHockeyPLAYING AREA98.8 m PLANNING ENVELOPE62.4 m PLANNING ENVELOPE91.4 × 55 m playing-area baselineBASIS91.4 × 55 m field reference with editable 3.7 m conceptual surround.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONHockey turf + containment sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYTurf, water/drainage, goals, high containment and lighting
Installed-field certification also checks dimensions, line marking, slope and drainage; containment and maintenance remain separate project systems.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentHockeyPLAYING / PERFORMANCE CORE01
Goals + backboards
02
Technical shelters
03
High containment
04
Irrigation / maintenance access
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScore / video · PACOORDINATION NOTESContainment edge · Team / spectator gates · Score / video · PAFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project