Skip to main content
Apollo NZ GlobalSPORT + KNOWLEDGE

SPORT + ACADEMY

Padel Academy

Plan the court, enclosure and complete padel venue as one system.

A 12-module self-guided learning pathway covering court footprint, court architecture, foundations, exposure, glass, turf, lighting, circulation, weather protection, multi-court clubs, venue infrastructure and the final project brief.

VETRAVA panoramic padel court with glass enclosure and integrated lighting
SELF-GUIDED12 MODULES
WHO IT IS FORPadel clubs · Schools · Resorts · Developers · Councils · Commercial venues
FORMATRead · Check · Apply
OUTCOMEA clearer project brief
Planning resource · Reviewed September 2026 · Final technical design and local compliance remain project-specific

How to use the Academy

Work through the decisions in order, then go deeper where the project needs it.

Each module gives you a planning outcome and a short set of questions to resolve. The linked guide provides the deeper technical context. You can follow the complete sequence or jump directly to the decision you are working on.

SPORT + ACADEMY is a practical education and planning resource. It is not a formal qualification, accreditation or professional-design substitute.

Direct answers

Understand the pathway before you start.

These short answers define the scope of the Academy and make the planning intent clear before you move into the modules.

01

What is the Padel Academy?

A 12-module self-guided learning pathway covering court footprint, court architecture, foundations, exposure, glass, turf, lighting, circulation, weather protection, multi-court clubs, venue infrastructure and the final project brief.

02

Who is this Academy for?

This self-guided planning pathway is intended for Padel clubs · Schools · Resorts · Developers · Councils · Commercial venues. It is designed to support early project understanding before detailed product specification or local professional design.

03

What does the Academy cover?

The pathway contains 12 modules covering understand the 10 × 20 m court and full site footprint, choose the court architecture around the venue, assess the base, anchors and foundations, plan wind, corrosion and destination conditions, understand glass, mesh and enclosure safety, select the turf and playing-surface pathway and the final project brief.

04

Is SPORT + ACADEMY a formal qualification or accreditation?

No. SPORT + ACADEMY is a practical education and planning resource. It does not provide formal accreditation and does not replace project-specific professional, engineering, safety or statutory advice.

PLANNING BOARD 03

Padel enclosure + venue interfaces

Court structure, glass, mesh, doors, anchors, lighting, circulation and future courts need to be resolved as one venue system.Conceptual planning diagram · not a construction drawing
10 × 20 m COURTturf · net · enclosureGLASS / MESH ENCLOSUREACCESSACCESSVENUE INTERFACESfoundationslightingcirculationfuture courts

Real-world reference

Pair the planning logic with the actual system.

These current project and manufacturer references show the types of systems discussed in the Academy. Final layouts, dimensions, engineering and supplied configurations remain project-specific.

VETRAVA 360 panoramic padel court at sunset01
VETRAVA 360

Panoramic court architecture changes the venue experience.

Glass, steel, lighting and sightlines work together as one enclosure, especially where spectator visibility and premium presentation matter.

VETRAVA 360 panoramic padel court in daylight02
Daylight reference

Foundations and exposure sit behind the visible court.

The finished enclosure depends on the site, anchors, local wind and corrosion environment, even when the visible court geometry appears standard.

VETRAVA 360 padel court illuminated for night play03
Night operation

Lighting should be designed with the enclosure.

Court-mounted lighting, glare, operating hours and adjacent uses should be coordinated before the multi-court layout is repeated across the site.

Learning pathway

12 decisions that shape the facility.

Resolve the early project questions before detailed product specification. That reduces rework and makes later supplier, consultant and project-team conversations more useful.

01
MODULE 01

Understand the 10 × 20 m court and full site footprint

What you need to decide

Start with the standard playing enclosure, then add the surrounding space needed for access, circulation, spectators, maintenance and future courts.

Information to collect

What is the clear site beyond the 10 × 20 m court?

Where will players enter, wait and circulate?

Is the project one court, multiple courts or part of a larger venue?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
Module 1 of 12Next
02
MODULE 02

Choose the court architecture around the venue

What you need to decide

Compare panoramic, commercial framed, classic and relocatable court pathways against the venue model rather than appearance alone.

Information to collect

Is spectator visibility a major priority?

Is the project premium, commercial, community or temporary?

Does the court need to support future relocation or staged expansion?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 2 of 12Next
03
MODULE 03

Assess the base, anchors and foundations

What you need to decide

Treat the court structure, anchors, slab and foundations as one engineered system tied to the destination and site.

Information to collect

What slab or foundation system exists or is proposed?

What loads must anchors and foundations resist?

Who owns the local structural and civil design responsibilities?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 3 of 12Next
04
MODULE 04

Plan wind, corrosion and destination conditions

What you need to decide

Match steelwork, coating, fasteners, anchors and engineering evidence to the actual exposure environment.

Information to collect

What wind, seismic and corrosion conditions apply?

Is the site coastal, exposed or cyclone-prone?

What destination-specific engineering evidence is required before supply?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 4 of 12Next
05
MODULE 05

Understand glass, mesh and enclosure safety

What you need to decide

Coordinate tempered glass, framed mesh, doors and protective details around the selected court system and intended level of use.

Information to collect

What glass layout and thickness belong to the selected court?

Where do doors and mesh panels sit relative to play and circulation?

What local safety or compliance checks are required?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 5 of 12Next
06
MODULE 06

Select the turf and playing-surface pathway

What you need to decide

Choose padel-specific artificial turf around court model, level of play, drainage, maintenance and replacement planning.

Information to collect

What turf construction is supplied with the selected court?

How will drainage and infill be managed?

What cleaning, brushing and replacement plan is realistic for the operator?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 6 of 12Next
07
MODULE 07

Design court lighting around visibility and glare

What you need to decide

Coordinate mounting positions, luminaire package, aiming, glare and operating hours with the court structure.

Information to collect

What level of play and operating hours drive the lighting brief?

Are the standard court-mounted lights sufficient for the intended use?

Are neighbours, glare or spill-light constraints relevant?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 7 of 12Next
08
MODULE 08

Plan access, circulation and spectators

What you need to decide

Resolve player entry, waiting areas, spectator sightlines, seating and service access before repeating the court layout.

Information to collect

How will players enter without conflicting with adjacent courts?

Where can spectators watch without blocking circulation?

What maintenance and emergency access is needed around the enclosure?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 8 of 12Next
09
MODULE 09

Decide whether the venue needs weather protection

What you need to decide

Coordinate padel courts with membrane structures, air domes or larger sports buildings when all-weather use is required.

Information to collect

What weather is limiting operating hours?

What clear span and internal height are required above the courts?

How do lighting, ventilation, services and structure interact under cover?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 9 of 12Next
10
MODULE 10

Scale from a single court to a multi-court club

What you need to decide

Plan repeated courts around circulation, booking flow, waiting space, amenities, viewing, storage and future expansion.

Information to collect

How many courts fit without compromising circulation?

What player and spectator amenities are needed at the target capacity?

How will later courts or buildings connect to the first stage?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 10 of 12Next
11
MODULE 11

Connect clubhouse, changing and venue infrastructure

What you need to decide

Treat courts, amenities, sports buildings, seating, storage and site services as a coordinated facility rather than isolated purchases.

Information to collect

What changing, ablution, reception or storage spaces are required?

Where do power, drainage and other services need to reach the courts?

Which elements are supplied systems versus local project works?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.
PreviousModule 11 of 12Next
12
MODULE 12

Build the padel project brief

What you need to decide

Combine court type, site conditions, exposure, foundations, glass, turf, lighting, cover and venue requirements into one review package.

Information to collect

Which court pathway is preferred and why?

Are site dimensions, exposure and base/foundation conditions documented?

What local engineering, installation and approval responsibilities remain outside supply?

Saved decisions feed into Your Facility Plan, My Apollo Project and the Sports Project Brief.

SPORT + TOOLS

Apply what you have learned.

Use the planning tools when you are ready to translate the Academy modules into dimensions, comparisons and a structured project brief.

SPORT + KNOWLEDGE

Continue learning

Continue into the wider Facility Planning Academy.

Use the complete facility framework when the padel project expands into covered sport, shared amenities, spectator infrastructure, sports buildings or a larger multi-sport development.

Open Facility Planning Academy
Project