What is SARENTA SPAN · Project & Logistics Storage?
Apollo-developed logistics application using documented prefabricated warehouse capability.
Start Project BriefProjects · logistics · temporary capacity
SARENTA SPAN suits project sites, logistics programmes and temporary capacity where the building needs to arrive quickly, provide clear internal space and avoid unnecessary permanent-building complexity.

Direct project answers
Apollo-developed logistics application using documented prefabricated warehouse capability.
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Project application
This application combines the documented warehouse platform with Apollo project-logistics planning. The exact temporary, semi-permanent or permanent classification is set project by project.
Project priorities
Temporary, semi-permanent and permanent intent changes anchoring, engineering, envelope and approval requirements.
If future relocation matters, foundation, anchoring and fit-out should avoid unnecessary site-specific permanence.
Packing, site access, cranes, labour and erection sequencing need to be included in the delivery plan.
Power, lighting, HVAC, fire systems and data remain defined separately against the actual operational use.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Scalable clear-span frame
Temporary / semi-permanent anchoring pathways
Wall + door options
Lighting pathway
Insulation option
CAD
Installation manuals
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.