What is SARENTA EVENT · Corporate & Brand Events?
Corporate and brand-event application pathway using documented event structures. AV, stage, truss, lighting, guest operations and local event approvals…
Start Project BriefCorporate · activation · hospitality
Use SARENTA EVENT where a conventional marquee is too basic but a permanent venue is unnecessary. The clear-span shell can be coordinated with AV, lighting, stage, flooring and guest infrastructure.

Direct project answers
Corporate and brand-event application pathway using documented event structures. AV, stage, truss, lighting, guest operations and local event approvals…
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Established application
SARENTA project experience includes large public events, opening ceremonies, stage-led events and premium clear-span hospitality structures.
Project priorities
Entrance sequence, glazing, wall finish, internal lining, signage interfaces and lighting determine whether the venue reads as premium rather than temporary.
Sound, LED, stage, truss and lighting loads should be coordinated with HLJÓÐ and the structural brief from the beginning.
Reception, catering, toilets, staff, storage and service access need to sit behind the visible guest environment.
Build, event operation and dismantle windows influence structure, flooring, access and logistics.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Flooring
Stage flooring
Lighting truss
LED + AV coordination
Glass walls
Doors
Ceiling lining
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.