Skip to main content
Apollo NZ Global

Middle East / Technical planning

Technical Product Planning — Middle East

Climate, structural, material, compliance and evidence checks for Apollo project-supply products in Middle East.

The UAE, Saudi Arabia, Qatar, Oman, Bahrain and Kuwait are separate customs and technical jurisdictions. GCC membership does not make import tax or product approval identical across all destinations.

Request a Middle East supply quotation →

Apollo NZ Global is supply-only. Local customs clearance, statutory approvals, site engineering, installation and destination works are not included unless expressly identified in a written quotation.

Buyer pathway

From site conditions to defensible specifications.

01

Site-specific design criteria

Have the appointed local professional establish wind, snow, seismic, exposure and use requirements where applicable.

02

Durability and environmental exposure

Specify heat, UV, rain, humidity, coastal salt, dust, coatings, fasteners, drainage and maintainability for the actual site.

03

Technical submittal evidence

Request selected-model drawings, relevant performance tests, declarations and certifications where applicable, and warranty and operating information.

04

Installation and approvals

Define foundations, fixing, electrical work, permits, independent testing, sign-off and the local installer before order confirmation.

Site and engineering

Confirm conditions before claiming suitability.

Applicable project requirements

Verify destination building code, wind and structural loads, fire classification and applicable consultant submittals.

Environment and durability

Assess extreme heat, UV, sand, dust, humidity and coastal salt separately for each site.

Documentation and acceptance

Confirm electrical voltage, plug/controls, service access, warranties, finishes and local professional sign-off.

Destination compliance

Evidence to request before product approval.

Manufacturer drawings

Request drawings, model identification and site-specific design criteria; make clear which information is indicative rather than project-certified.

Model-specific evidence

Request test reports, declarations, product markings and fire, structural or electrical evidence only where applicable to the selected model; verify exact standard and test scope.

Local review and acceptance

Confirm with the appointed local professionals whether the available evidence satisfies the authority, consultant and procurement requirements before placing an order.

Rates, legal requirements and applicable certifications can change. This page does not provide binding customs, tax, engineering or legal advice; verify with the local importer, regulator and appointed professionals.

Product pathways

Explore the relevant Apollo systems.

ZAHREQ architectural membranes

System options and current manufacturer documentation are assessed for the exact destination and project.

Explore this product →

ARKEN architectural roofs

System options and current manufacturer documentation are assessed for the exact destination and project.

Explore this product →

ZABALERA large-span structures

System options and current manufacturer documentation are assessed for the exact destination and project.

Explore this product →

Sports seating and venues

System options and current manufacturer documentation are assessed for the exact destination and project.

Explore this product →

CIVARO public realm

System options and current manufacturer documentation are assessed for the exact destination and project.

Explore this product →

Importing and freight matter before ordering.

Coordinate the product's local design and compliance with its freight and receiving arrangements, rather than leaving these decisions until after manufacture.

Read the companion shipping and importing guide →

Request a project quotation for Middle East.

Provide destination, project use, dimensions, quantities, drawings if available, time frame, local contractor and receiving details. Apollo reviews scope and pricing manually.

Start a supply-only enquiry →
Project