Indoor and outdoor systems
Modular tiles, resilient indoor systems, selected timber pathways, running surfaces and multi-sport options can be matched to the facility brief.

Middle East / Saudi Arabia / Enlio sports flooring & court systems
Saudi sports-flooring projects should separate sport mix, competition level, indoor or outdoor use, base condition, heat, drainage, operating intensity and maintenance before the exact surface is selected. Apollo can review Enlio and related court pathways around the actual venue.
Country × product authority
Modular tiles, resilient indoor systems, selected timber pathways, running surfaces and multi-sport options can be matched to the facility brief.
Outdoor courts need project-specific review of solar load, heat, drainage, base condition and expected operating hours.
Academies and campuses should separate training, competition, school, community and event use before one surface is specified.
Where federation, fire, slip or other documentation is required, the exact current product evidence should be confirmed before tender reliance.
Project brief
The better the project information, the faster Apollo can separate manufacturer capability, product scope and freight from local engineering, installation and statutory responsibilities.
Planning & documentation
A clearly labelled non-customer framework for schools coordinating court surfaces, pump tracks, lighting, VAKTAR AI, maintenance and staged procurement.
Review resourceA non-customer framework for clubs comparing court surfaces, pickleball conversion, lighting, accessories and sports technology without publishing private customer jobs.
Review resourceApollo's current Enlio material records Olympic 3x3 supply at Tokyo 2020 and Paris 2024 and current FIBA Level 1 listings for selected SES systems; exact current model documentation is confirmed per project.
Review resourceCommon project questions
Yes. Apollo can review suitable Saudi sports-flooring projects subject to the selected system, quantity, destination and technical requirements.
No. Indoor or outdoor use, heat, base condition, drainage, sport mix and maintenance expectations should be reviewed for the actual facility.
Yes. Flooring can be scoped alongside seating, lighting, VAKTAR AI and other venue systems while each package remains separately defined.
Apollo is supply-led. Local installation, base preparation, civil work and approvals remain with the destination project team or appointed specialist.
Manual project review
Apollo reviews the supply pathway and available technical information. Pricing is prepared manually after the project scope is checked.
Open project brief