Competition and training pathways
Selected indoor and outdoor systems can be reviewed around training, competition, academy and shared-use requirements.

Middle East / Qatar / Enlio sports flooring & court systems
Qatar sports-surface projects should be selected around sport mix, competition level, indoor or outdoor use, base condition, heat, drainage and venue operations. Apollo can review flooring alongside wider venue infrastructure without forcing a bundled package.
Country × product authority
Selected indoor and outdoor systems can be reviewed around training, competition, academy and shared-use requirements.
Outdoor courts require project-specific review of solar load, temperature, drainage, base condition and maintenance.
Flooring can sit alongside seating, lighting, cameras and other sports systems while retaining its own technical specification.
Exact product evidence should be confirmed against the current system before it is relied upon for a project or tender claim.
Project brief
The better the project information, the faster Apollo can separate manufacturer capability, product scope and freight from local engineering, installation and statutory responsibilities.
Planning & documentation
A clearly labelled non-customer framework for schools coordinating court surfaces, pump tracks, lighting, VAKTAR AI, maintenance and staged procurement.
Review resourceA non-customer framework for clubs comparing court surfaces, pickleball conversion, lighting, accessories and sports technology without publishing private customer jobs.
Review resourceApollo's current Enlio material records Olympic 3x3 supply at Tokyo 2020 and Paris 2024 and current FIBA Level 1 listings for selected SES systems; exact current model documentation is confirmed per project.
Review resourceCommon project questions
Yes. Apollo can review suitable Qatar sports-surface projects subject to product selection, quantity, site and technical requirements.
Potentially. The sport mix, line marking, shock, traction, ball response and operating priorities need to be defined before one surface is selected.
Yes. It can be coordinated with seating, lighting, technology and building systems while remaining separately specified.
Apollo remains supply-led. Local installation, base preparation and statutory requirements remain with the appointed project team.
Manual project review
Apollo reviews the supply pathway and available technical information. Pricing is prepared manually after the project scope is checked.
Open project brief