RHELGAN Water Systems

Education Infrastructure

RW-S01

School Water System

A school-focused water pathway connecting drinking water, hand hygiene, sanitation, cleaning and selected kitchen or staff requirements to one project brief.

20-50 m³ planning rangeinitial planning envelope
01Source
02storage
03treatment
04school + WASH distribution

Source pathways to review

Start with the water that is actually available.

RainwaterBore / groundwaterMunicipal or delivered waterMixed supply with controlled changeover

System architecture

Build the operating system around storage.

01

Storage reviewed against school-day demand, source reliability and closure periods

02

Treatment selected for drinking and hygiene uses

03

Separate or controlled branches for drinking points, WASH and other uses where appropriate

04

Pressure system sized around peak breaks and sanitation use

05

Integration with RHELGAN WASH blocks and school amenities

Project inputs

What we need before the configuration is locked.

Student and staff population

School hours, boarding and community use

Number and type of WASH facilities

Kitchen / food-service requirement

Source-water analysis and seasonal availability

Power reliability and maintenance capacity

Operations + maintenance

Design for the people who will run it.

Plan cleaning, handwashing and drinking-water continuity together

Allow for high short-duration demand around breaks

Keep treatment consumables and spare pump items on site where logistics are difficult

Define responsibility for water-quality checks and tank hygiene

Project resources

Carry this configuration into a controlled project package.

Project specification control

Student numbers are only one input. Boarding, kitchens, sports, WASH fixture counts, community use and source reliability can materially change storage and pumping requirements.

Final storage volume, material, potable-water evidence, treatment process, pump duty, structural design, foundations, controls, installation, commissioning and destination requirements are confirmed for the exact project configuration.