Skip to main content
Apollo NZ GlobalStart RHELGAN Project Brief
Illustrative RHELGAN modular multi-user sanitation blockIllustrative RHELGAN project visual
RHELGAN WASH & Sanitation
RHELGANDevelopment & Humanitarian Systems

Fixed sanitation

Standard Sanitation Block

The core multi-user RHELGAN sanitation platform for schools, communities, camps, public facilities and development programmes.

REFERENCE SIZEApprox. 5,800 × 2,250 × 2,500 mm
PLANNING BASIS5–6 WC planning configurations
PLATFORMTransportable modular block
PROJECT STATUSConfigurable project supply

Confirmed manufacturing basis

A defined starting platform, not a universal specification.

The information below is limited to the current manufacturing material already reviewed by Apollo. It establishes the base geometry and sanitary configuration. Final engineering, compliance and service interfaces are closed against the actual project before production.

Steel container-style structure
50 mm EPS sandwich-panel wall basis
Anti-slip PVC floor finish
Current five-WC and six-WC layouts
Internal plumbing + electrical provision

Typical applications

Use the system where the operating brief fits.

01

Schools

02

Community facilities

03

Workforce + field sites

04

Humanitarian accommodation

05

Temporary public infrastructure

06

Development programmes

Project configuration

Close the variables that matter before the module is released to production.

System configuration

WC + basin schedule

Male / female / general-use allocation

Ventilation

Interior finishes

Utility entry points

Water + wastewater

Confirm source, pressure, storage, hot-water demand, sewer / septic / holding / treatment pathway and local connection responsibility.

Standards + accessibility

Destination public-health, accessibility, electrical, structural and statutory requirements are project inputs and are not inferred from a standard factory layout.

Site + handover

Foundation or supports, lifting, unloading, external services, installation, commissioning, cleaning, spares and maintenance ownership are defined in the project scope.

Required project controls

Information we need to close the specification.

User population

Privacy + safeguarding

Cleaning + maintenance

Water + wastewater capacity

Applicable public-health requirements

Evidence + compliance control

Published dimensions and fixture schedules are reference configurations only. RHELGAN does not claim universal accessibility, structural, fire, electrical, potable-water, wastewater, medical or destination compliance from the base layout. Those requirements are confirmed from project-specific evidence and the appointed local professionals before order.

RHELGAN · WASH & SANITATION SYSTEMS

Tell us who the facility serves, where it is going and how water and wastewater will work.

Start RHELGAN Project Brief View WASH range
Project