Skip to main content
Apollo NZ GlobalStart RHELGAN Project Brief
Illustrative RHELGAN compact trailer-mounted hygiene unitIllustrative RHELGAN project visual
RHELGAN WASH & Sanitation
RHELGANDevelopment & Humanitarian Systems

Mobile field

Compact Mobile Hygiene Unit

A compact trailer-mounted toilet and shower platform for temporary, mobile and field operations where sanitation must move with the project.

REFERENCE SIZEApprox. 4,300 × 1,300 × 2,500 mm
PLANNING BASIS2 WC / shower positions · 2 basins · 200 L fresh + 200 L waste
PLATFORMTrailer-mounted mobile unit
PROJECT STATUSConfigurable project supply

Confirmed manufacturing basis

A defined starting platform, not a universal specification.

The information below is limited to the current manufacturing material already reviewed by Apollo. It establishes the base geometry and sanitary configuration. Final engineering, compliance and service interfaces are closed against the actual project before production.

Galvanized steel frame basis
Onboard 200 L fresh-water tank
Onboard 200 L waste tank
Two sanitary positions
Internal plumbing + electrical provision

Typical applications

Use the system where the operating brief fits.

01

Disaster response

02

Field teams

03

Temporary projects

04

Remote construction

05

Mobile services

06

Short-duration deployments

Project configuration

Close the variables that matter before the module is released to production.

System configuration

WC / shower mix

Fixture package

Power connection

Hot-water option

External service connections

Water + wastewater

Confirm source, pressure, storage, hot-water demand, sewer / septic / holding / treatment pathway and local connection responsibility.

Standards + accessibility

Destination public-health, accessibility, electrical, structural and statutory requirements are project inputs and are not inferred from a standard factory layout.

Site + handover

Foundation or supports, lifting, unloading, external services, installation, commissioning, cleaning, spares and maintenance ownership are defined in the project scope.

Required project controls

Information we need to close the specification.

Road / towing requirements

Tank servicing frequency

Water refill access

Waste disposal route

Destination trailer / road requirements

Evidence + compliance control

Published dimensions and fixture schedules are reference configurations only. RHELGAN does not claim universal accessibility, structural, fire, electrical, potable-water, wastewater, medical or destination compliance from the base layout. Those requirements are confirmed from project-specific evidence and the appointed local professionals before order.

RHELGAN · WASH & SANITATION SYSTEMS

Tell us who the facility serves, where it is going and how water and wastewater will work.

Start RHELGAN Project Brief View WASH range
Project