Skip to main content
Apollo NZ GlobalStart RHELGAN Project Brief
Illustrative RHELGAN combined modular toilet and shower blockIllustrative RHELGAN project visual
RHELGAN WASH & Sanitation
RHELGANDevelopment & Humanitarian Systems

Shower + hygiene

Combined Hygiene Block

Toilets, showers and hand-washing facilities consolidated into one transportable module for medium-scale project sites.

REFERENCE SIZEApprox. 5,800 × 2,250 × 2,500 mm
PLANNING BASIS3 WC · 3 showers · 4 basins
PLATFORMTransportable modular block
PROJECT STATUSConfigurable project supply

Confirmed manufacturing basis

A defined starting platform, not a universal specification.

The information below is limited to the current manufacturing material already reviewed by Apollo. It establishes the base geometry and sanitary configuration. Final engineering, compliance and service interfaces are closed against the actual project before production.

Three-WC reference layout
Three-shower reference layout
Four-basin reference arrangement
Steel modular structure
Internal plumbing + electrical provision

Typical applications

Use the system where the operating brief fits.

01

Displacement + temporary accommodation

02

Remote settlements

03

Reconstruction projects

04

Worker accommodation

05

Field bases

06

Community facilities

Project configuration

Close the variables that matter before the module is released to production.

System configuration

Fixture mix

Hot-water arrangement

Privacy layout

Ventilation

External finish + signage package

Water + wastewater

Confirm source, pressure, storage, hot-water demand, sewer / septic / holding / treatment pathway and local connection responsibility.

Standards + accessibility

Destination public-health, accessibility, electrical, structural and statutory requirements are project inputs and are not inferred from a standard factory layout.

Site + handover

Foundation or supports, lifting, unloading, external services, installation, commissioning, cleaning, spares and maintenance ownership are defined in the project scope.

Required project controls

Information we need to close the specification.

Users + peak demand

Water storage / pressure

Wastewater route

Hot-water energy source

Accessibility requirement

Evidence + compliance control

Published dimensions and fixture schedules are reference configurations only. RHELGAN does not claim universal accessibility, structural, fire, electrical, potable-water, wastewater, medical or destination compliance from the base layout. Those requirements are confirmed from project-specific evidence and the appointed local professionals before order.

RHELGAN · WASH & SANITATION SYSTEMS

Tell us who the facility serves, where it is going and how water and wastewater will work.

Start RHELGAN Project Brief View WASH range
Project