FÍSVOR · PROJECT SUBMITTALS
LED project specification schedule
Capture the details needed to request an evidence-backed model recommendation. The document is designed for early specification, not as a certified engineering design.
Supplier datasheets must be reconfirmed for current production models. Do not treat this schedule as an approved test certificate, structural design, electrical approval or manufacturer warranty.
Manufacturer evidence checklist
- Current model datasheet with revision date
- Pixel pitch, brightness and power verified to the selected configuration
- Test reports for ingress protection, electrical and EMC claims
- Rigging, wind/structural loads and mounting documents as applicable
- Spare modules, service plan and receiving-card compatibility
- Warranty schedule including coverage and exclusions
