Application: outdoor TV, commercial display or venue display
FÍSVOR · PROJECT AUTHORITY CENTRE
Move from product interest to a controlled project specification.
Match display brightness, viewing distance, direct-sun exposure, panel temperature, thermal design, enclosure, mounting, wind, network/content and service access to the actual installation.
01 · PROJECT INPUTS
Define the conditions before the exact system is released.
These inputs are deliberately upstream of model selection so the product does not dictate the brief.
Screen size / viewing distance / orientation
Covered, partial-sun or full-sun exposure
Required brightness and ambient-light conditions
Panel-temperature / thermal-management requirement
Wall/freestanding/dual-sided/touch mounting pathway
Wind/structure and fixing substrate
Power, network, content/CMS and service access
02 · EVIDENCE CONTROL
Keep project claims attached to what the evidence actually proves.
Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.
Exact panel brightness and size data
Panel-temperature limits and thermal architecture for full-sun claims
IP/environmental evidence
Mounting/structure/fixing data
Touch/glass/display configuration evidence
Power/network/control documentation
Warranty, spares and service strategy
03 · CAD / DRAWING REGISTER
Planning references are not exact-system construction drawings.
Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.
| Resource | Status | Purpose |
|---|---|---|
| Display concept / planning layout | Public planning | Early scope, interface and consultant coordination only. |
| Generic technical reference / typical detail | Public planning | Explains system logic without representing an exact supplied configuration. |
| Exact-system GA / dimensional drawing | Exact-system | Issued only after the quoted system/configuration is known. |
| Native CAD / DWG / DXF | Verify availability | Availability and revision must be confirmed against the exact supplied system. |
| BIM / Revit / IFC object | Verify availability | Only described as BIM where a genuine verified native model exists. |
| Foundation / fixing / setting-out drawing | Project-specific | Depends on site/building conditions, local engineering and the selected system. |
| Services / electrical / controls interface | Project-specific | Coordinates the supplied system with local power, data, water, drainage or controls. |
04 · SPECIFICATION STARTER
Write the project around performance, interfaces and evidence.
These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.
Application/environment class
Screen size and viewing distance
Brightness and thermal performance
Enclosure/IP/environment
Mounting/wind/structure
Touch/interactive configuration
Power/network/CMS
Service/replacement access
Evidence/warranty/spares
05 · TENDER / RFP SCHEDULE
Ask bidders for the same controlled information.
A consistent schedule makes technical comparison easier and reduces hidden assumptions.
Display schedule
Size/quantity
Viewing distance/orientation
Sun exposure
Mounting
Wind/environment
Power/network/CMS
Touch/interactive needs
Evidence
Service/warranty
06 · OPERATIONS & HANDOVER
Specify how the system will be maintained after delivery.
Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.
Screen/enclosure cleaning
Thermal/fan/filter monitoring
Brightness/content health check
Mount/fixing inspection
Seal/cable-gland inspection
Touch calibration where applicable
Network/CMS monitoring
Critical spare/display replacement plan
DOWNLOADABLE PROJECT RESOURCE
Carry the authority pack into the project file.
Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.