Move from product interest to a controlled project specification.

Match display brightness, viewing distance, direct-sun exposure, panel temperature, thermal design, enclosure, mounting, wind, network/content and service access to the actual installation.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Application: outdoor TV, commercial display or venue display

02

Screen size / viewing distance / orientation

03

Covered, partial-sun or full-sun exposure

04

Required brightness and ambient-light conditions

05

Panel-temperature / thermal-management requirement

06

Wall/freestanding/dual-sided/touch mounting pathway

07

Wind/structure and fixing substrate

08

Power, network, content/CMS and service access

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact panel brightness and size data

02

Panel-temperature limits and thermal architecture for full-sun claims

03

IP/environmental evidence

04

Mounting/structure/fixing data

05

Touch/glass/display configuration evidence

06

Power/network/control documentation

07

Warranty, spares and service strategy

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Display concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Application/environment class

02

Screen size and viewing distance

03

Brightness and thermal performance

04

Enclosure/IP/environment

05

Mounting/wind/structure

06

Touch/interactive configuration

07

Power/network/CMS

08

Service/replacement access

09

Evidence/warranty/spares

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Display schedule

02

Size/quantity

03

Viewing distance/orientation

04

Sun exposure

05

Mounting

06

Wind/environment

07

Power/network/CMS

08

Touch/interactive needs

09

Evidence

10

Service/warranty

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Screen/enclosure cleaning

02

Thermal/fan/filter monitoring

03

Brightness/content health check

04

Mount/fixing inspection

05

Seal/cable-gland inspection

06

Touch calibration where applicable

07

Network/CMS monitoring

08

Critical spare/display replacement plan

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.