Skip to main content

FÍSVOR · LED DISPLAY SOLUTIONS

Outdoor Commercial LED Displays

Permanent large-format outdoor screens. Project-led supply for shopping districts, developments, hospitality and public information.

Product illustration of an MH-series outdoor LED display
FÍSVOR product reference image. Final model, configuration and finish are confirmed during project selection.
The equipment ranges below are manufacturer-documented candidates, not approved or independently tested products. Display performance, warranty, ingress protection and compliance are checked against the chosen configuration before quotation.

Project applications

Shopping districts, developments, hospitality and public information

Final system design is based on the project environment, audience distance, content, viewing angles and operating schedule.

Technical selection

  • Screen width, height and aspect ratio
  • Minimum and typical viewing distances
  • Brightness, resolution and filmed-content requirements
  • Mounting, service access, power and thermal constraints
  • Applicable evidence, local engineering and certification

Supply-only project service

We assist with manufacturer product selection, equipment specification and supply. Site works, structural engineering, installation, commissioning and permits are coordinated by the appointed project team.

How systems are selected

We evaluate suitable display models against viewing distance, expected screen content, environmental exposure, support structure, power requirements and service access. Technical specifications and compliance evidence are confirmed for the selected project configuration.

Application-specific technical guidance

External display planning starts with daylight exposure, viewing positions, screen scale and access for service. High brightness does not substitute for full installation evidence.

System selection decisions

  • Determine target content legibility at the actual approach and viewing distances
  • Check ambient-light conditions and brightness-control strategy
  • Establish façade or freestanding structural loads and wind exposure
  • Confirm ventilation, drainage, cable management and safe service access

Documentation to request

  • Current brightness and power test data
  • IP evidence for the actual assembled screen
  • Engineering drawings and fixing interfaces
  • Electrical and electromagnetic compatibility documents

Weather resistance and installed-system suitability require project-specific confirmation.

Plan this display project

Use the project selection guide for technical requirements, then send a project brief to request a current model shortlist and supply-only quotation.

Project