Flatness and drainage are separate checks
A court can look flat and still pond. Survey local undulations and the overall drainage path rather than relying on visual inspection.
Project BriefKNOTTR CIVIL INTERFACE
The playing surface cannot correct a failed supporting base. Base flatness, water management, cracking and perimeter transitions should be known before the sports surface is released.
PLANNING REFERENCE
This page answers one narrow planning question. Use the Technical Centre and Project Brief for the complete 3x3 system.
A court can look flat and still pond. Survey local undulations and the overall drainage path rather than relying on visual inspection.
Perforated or open-grid systems allow water movement through the playing layer, but water still needs a stable base and a controlled route away from the court.
Cracks, failed joints, local depressions and unsafe perimeter steps should be assessed before the final sports surface is installed.
PROJECT CHECK
Identify base type and age
Survey flatness and low spots
Confirm drainage outlets / direction
Assess cracks and joints
Resolve edge transitions and local civil responsibility
CONTINUE THE KNOTTR PATHWAY
The FIBA Venue Guide provides outdoor planning references; final slab/asphalt design remains project- and location-specific.
WHOLESALE & PROJECT SUPPLY
Apollo is supply-only. Final survey, civil works, foundations, electrical work, installation, statutory approvals and professional sign-off remain destination-project responsibilities unless expressly included.