Start with water
Survey the supporting base, identify ponding and give water a route away from the playing area. Open-grid surfaces do not remove the need for a functioning civil base.
Project BriefKNOTTR OUTDOOR COURTS
Outdoor performance is controlled by the site as much as by the court tile or coating. Drainage, heat expansion, UV, wind, lighting spill, corrosion and public-use maintenance should be resolved before product selection.
PLANNING REFERENCE
This page answers one narrow planning question. Use the Technical Centre and Project Brief for the complete 3x3 system.
Survey the supporting base, identify ponding and give water a route away from the playing area. Open-grid surfaces do not remove the need for a functioning civil base.
Check heat expansion, intense UV, wind-driven rain, coastal exposure and maintenance access against the selected surface, backstop, fencing and lighting.
Schools, councils and parks need maintainable edges, practical spare-part replacement, robust equipment and accessible circulation rather than event-only detailing.
PROJECT CHECK
Survey levels and drainage
Confirm surface climate suitability
Review backstop corrosion / exposure
Control lighting spill and glare
Plan gates, accessibility and maintenance access
CONTINUE THE KNOTTR PATHWAY
WHOLESALE & PROJECT SUPPLY
Apollo is supply-only. Final survey, civil works, foundations, electrical work, installation, statutory approvals and professional sign-off remain destination-project responsibilities unless expressly included.