TREVIK · Technical Centre

Coordinate the whole opening—not just the frame.

Large architectural openings, sectional glazing, transparent closures, shutters and entrance canopies depend on the building opening, structure, glass, hardware, drainage, controls, weather exposure and local compliance. This centre keeps those interfaces visible before fabrication dimensions are released.

Technical topics

The opening is a building-envelope system.

Maximum sizes, panel weights, tested performance and hardware limits remain exact-series claims. Do not transfer evidence from one opening family to another.

01

Opening geometry

Structural opening, panel count, stack/parking zone, head, jamb, sill, tolerances and usable clear opening should be resolved together.

02

Glass & infill

Glass build-up, safety glass, IGU/laminated/tempered pathways, coatings and panel weight affect frame, hardware and performance.

03

Wind / air / water

Air, water and wind claims must come from evidence for the exact series/configuration rather than a generic aluminium-door family.

04

Threshold & drainage

Recessed or raised tracks, drainage, accessibility, exterior falls and water-management details belong in the opening design.

05

Hardware & duty

Rollers, carriers, hinges, locks, operators and cycle requirements should match panel weight, frequency of use and maintenance strategy.

06

Structure & fixing

Head support, jamb/floor anchoring, frame deflection, substrate strength and perimeter interfaces remain project-specific.

07

Controls & safety

Powered shutters/closures require exact control, safety-device, emergency and electrical information for the selected system.

Architectural opening families

Match the evidence to the selected movement system.

Lift-slide, large sliding, folding and thermal-break systems solve different problems and need different technical evidence.

Evidence schedule

What should be verified before quotation or submittal.

Opening familyEvidence to confirm
TREVIK LIFT-SLIDEExact profile series · Panel size / weight limits · Roller / carriage hardware · Track / threshold detail · Glass build-up · Air / water / wind testing · Thermal evidence · Hardware cycle data
TREVIK LARGE SLIDINGExact series / profile · Track layouts · Panel dimensions · Glass build-up · Interlock details · Drainage / sill detail · Air / water / wind tests · Hardware limits
TREVIK FOLDExact folding series · Panel count / leaf limits · Hinge / carrier hardware · Head / sill details · Glass build-up · Air / water / wind tests · Cycle testing · Stack geometry
TREVIK THERMALExact profile series · Thermal-break geometry · Glass build-up · U-value / thermal modelling · Air / water / wind tests · Hardware schedule · Drainage details · Perimeter installation detail

Project brief

Information that should exist before fabrication dimensions are frozen.

Opening schedule

Width, height, quantity, location, opening direction, panel count and operational intent.

Building interface

Structural opening, head/jamb/sill substrates, floor build-up, façade/waterproofing and tolerances.

Glass / infill

Safety, thermal, acoustic, solar, privacy and aesthetic requirements.

Exposure

Wind region/site criteria, rain, coastal exposure, temperature and sheltered/exposed condition.

Operation

Manual or powered operation, duty cycle, access control, emergency operation and security expectations.

Installation boundary

What arrives supplied versus local frame support, flashing, sealant, wiring, drainage and installation labour.

Next step

Send the opening schedule and building details before selecting a profile.

Start TREVIK Project Brief