TREVIK · THRESHOLDS

Threshold and drainage design for large architectural openings.

The cleanest visual threshold can be the hardest detail to make weather-resistant. Floor levels, drains, sill geometry and accessibility must be resolved together.

SHORT ANSWER

Design the floor and water path before freezing the door.

Coordinate internal finished floor, external paving, sill/track depth, drainage channel, falls, waterproofing, accessible route and maintenance access as one section. Then choose the opening system that can work within that detail.

KEY PROJECT POINTS

What should drive the decision.

These are project inputs, not substitute engineering or automatic product approvals.

01

Flush thresholds reduce upstands but reduce passive water defence.

02

External falls should move water away from the opening.

03

Tracks need cleaning and drainage access.

04

Door pocket/stack zones can interrupt drainage paths.

05

Accessibility requirements may constrain sill height.

06

Wind-driven rain can exceed simple gravity drainage assumptions.

01

Draw one critical section

A section through internal floor, sill/track, external paving and drain exposes conflicts that plan drawings often hide.

02

Separate surface water and door drainage

Large terrace/paving flows should not be expected to discharge through the door's small track/weep system.

03

Protect accessibility

Threshold height, drainage grates, transitions and slip resistance should be coordinated with local accessibility requirements.

04

Make it maintainable

Leaves, sand, hair and debris can block tracks and drains. Cleaning access belongs in the design.

PROJECT INPUTS

What to have ready before asking for the exact system.

A stronger brief shortens the gap between product interest and a useful technical/commercial response.

01

Internal FFL

02

External paving level

03

External falls

04

Sill/track depth

05

Drain type/location

06

Waterproofing

07

Accessible route

08

Door stack/pocket

09

Wind-driven rain exposure

10

Canopy/overhang

11

Cleaning access

12

Local envelope detail

EVIDENCE BOUNDARY

The door supplier controls the sill; the project team controls the surrounding water management.

Use exact sill/track drawings and tested water-performance information as inputs, then coordinate site drainage, membranes, thresholds and external levels with the appointed designer.

TREVIK Technical CentreArchitectural-opening technical pathway and evidence framework.

FAQ

Questions project teams usually need answered.

Is a completely flush threshold always possible?

Not in every exposure/system. It depends on the exact sill, drainage, water performance and local accessibility/weather requirements.

Can paving drain into the door track?

It should not be assumed. Site drainage should manage bulk surface water independently.

Why do tracks need maintenance access?

Debris can obstruct rollers, weeps and drainage paths, reducing operation and weather performance.

Project