Starting reference
Two × 40 ft modular configuration
Start Project Brief
Product-faithful visualisation
MULTI-CONTAINER PERFORMANCE FACILITY
A two-container facility combining indoor strength / cardio with outdoor functional and climbing zones.
REFERENCE CONFIGURATION
This page represents the modular performance-centre pathway rather than one fixed retail SKU. The two-container concept is the starting reference, with larger five- and six-container concepts available for project development.
Two × 40 ft modular configuration
Indoor strength / cardio plus outdoor functional and climbing zones
Second-floor platform / leisure space shown in current reference concepts
Five- and six-container reference concepts are also present in the current range
Two 40 ft modules
Indoor strength and cardio
CONFIGURATION DIAGRAM
Schematic only. It shows the operating logic and training zones rather than a construction drawing or foundation plan.

TRAINING & EQUIPMENT ZONES
Exact quantities, brands, station layouts and attachments are confirmed in the project equipment schedule before quotation.
Container modules can house strength, free-weight, cardio and equipment-storage functions.
Central external rig and open training areas support group functional and conditioning work.
Climbing-wall, rope and elevated functional elements appear in the current multi-container concepts.
Second-floor platform / leisure space is shown in the current modular performance-centre reference family.
EXPANSION PATHWAY
The current range includes two-, five- and six-container reference concepts. These are project starting points, not locked retail packages.
Starting multi-container concept with indoor strength / cardio, outdoor functional work, climbing and an upper platform pathway.
Larger modular gym campus combining multiple indoor rooms with outdoor training and elevated support space.
Largest current reference concept, with a broader indoor / outdoor training programme and project-specific circulation.
PROJECT APPLICATIONS
Applications remain subject to the site's operating requirements, local approvals, engineering and final project brief.
Deployable or permanent strength, conditioning and functional-training infrastructure for athlete development.
Compact field systems, enclosed gyms and larger campus performance-centre pathways.
Indoor guest fitness or larger indoor / outdoor training facilities configured around the site and guest profile.
Containerised training infrastructure that can be freighted with the project and supplied around difficult logistics.
Project-led gym rooms, functional-training spaces and specialist container-based performance facilities.
Recreation and training infrastructure that can sit alongside wider accommodation, education or community programmes.
PROJECT PLANNING
Project-specific confirmation is required before final supply scope and technical sign-off.
Project-specific confirmation is required before final supply scope and technical sign-off.
Project-specific confirmation is required before final supply scope and technical sign-off.
Project-specific confirmation is required before final supply scope and technical sign-off.
COMMON TECHNICAL BASIS
These points are not a substitute for the exact order documentation, local engineering or installation design.
For the current F4 / 20 ft and larger F-series reference platforms reviewed, the manufacturer confirms hot-dip galvanising first, followed by the external paint / coating system and final colour finish.
Current manufacturer warranty documentation states 5 years for the container structure and training racks, and 1 year for training equipment, subject to the final supplied configuration and warranty terms.
Foundation, anchoring and wind design are project-specific. Location, local wind criteria, ground / foundation conditions, installation environment and anchoring method are required for technical review.
SUPPLY SCOPE
The system is supplied to order rather than stocked as a retail gym. Final equipment, branding, coating / finish, documentation, packing and freight are confirmed for the selected project.
Foundations, anchoring, local structural engineering, approvals, electrical and mechanical connections, cranage, installation and site works are excluded unless expressly included.
TORVYR · BUILT FOR THE WORK.