Skip to main content
Apollo NZ GlobalStart Project Brief
TORVYR Enclosed 40 illustrative project visualProduct-faithful visualisation
TORVYR — Strength & Training Systems

40 FT ENCLOSED INDOOR GYM

TORVYR Enclosed 40

The larger enclosed configuration combines indoor training and storage within a 40 ft containerised room.

REFERENCE CONFIGURATION

What the current technical information supports.

The current documented configuration is an integrated indoor training-and-storage room. Final glazing, services, equipment and internal layout are confirmed to the project rather than assumed from the reference visual.

Reference envelope

Approx. 12.19 × 2.44 × 2.59 m container format in current technical information

Interior floor

20 mm rubber flooring stated

Envelope

Wall and ceiling insulation stated

Fit-out

Power, sockets, lighting and air-conditioning provision stated; full-wall mirror pathway shown

System feature 1

Integrated training and storage

System feature 2

Wall / ceiling insulation

CONFIGURATION DIAGRAM

How the current reference is organised.

Schematic only. It shows the operating logic and training zones rather than a construction drawing or foundation plan.

TORVYR Enclosed 40 high-resolution reference diagram showing rack and lifting zone, free-weight storage, mirror wall, lighting, services and approximate container envelope

TORVYR Enclosed 40 - technical reference

Reference envelope
Approx. 12.19 × 2.44 × 2.59 m
Floor
20 mm rubber flooring stated in current technical information
Envelope
Wall and ceiling insulation stated
Services
Power, sockets, lighting and air-conditioning provision stated
Interior
Integrated training, storage and full-wall mirror pathway
Site input required
Power standard, HVAC expectations, support / foundation, lifting and local building requirements

TRAINING & EQUIPMENT ZONES

Build the equipment schedule around the operating model.

Exact quantities, brands, station layouts and attachments are confirmed in the project equipment schedule before quotation.

ZONE 01

Rack Zone

Integrated indoor rack and barbell training pathway arranged along the container length.

ZONE 02

Free Weights

Dumbbell, kettlebell and plate storage kept inside the protected training room.

ZONE 03

Mirror / Coaching

Full-wall mirror pathway shown in the current source concept for technique and room visibility.

ZONE 04

Services

Lighting, sockets and provision for climate-control equipment are coordinated to the destination and scope.

PROJECT APPLICATIONS

Where this configuration can fit.

Applications remain subject to the site's operating requirements, local approvals, engineering and final project brief.

01

Sports Academies

Deployable or permanent strength, conditioning and functional-training infrastructure for athlete development.

02

Schools & Universities

Compact field systems, enclosed gyms and larger campus performance-centre pathways.

03

Hotels & Resorts

Indoor guest fitness or larger indoor / outdoor training facilities configured around the site and guest profile.

04

Remote & Workforce Sites

Containerised training infrastructure that can be freighted with the project and supplied around difficult logistics.

05

Commercial Fitness

Project-led gym rooms, functional-training spaces and specialist container-based performance facilities.

06

Development Projects

Recreation and training infrastructure that can sit alongside wider accommodation, education or community programmes.

PROJECT PLANNING

Information to close before quotation.

01

Define the intended training mix and exact indoor equipment schedule.

Project-specific confirmation is required before final supply scope and technical sign-off.

02

Confirm destination electrical requirements, air-conditioning / ventilation expectations and service connection scope.

Project-specific confirmation is required before final supply scope and technical sign-off.

03

Review egress, access, door / glazing configuration and local building requirements.

Project-specific confirmation is required before final supply scope and technical sign-off.

04

Confirm transport, lifting, foundation / support and final site installation responsibilities.

Project-specific confirmation is required before final supply scope and technical sign-off.

COMMON TECHNICAL BASIS

Technical information currently established for the programme.

These points are not a substitute for the exact order documentation, local engineering or installation design.

PROJECT CONTROL

Corrosion protection

For the current F4 / 20 ft and larger F-series reference platforms reviewed, the manufacturer confirms hot-dip galvanising first, followed by the external paint / coating system and final colour finish.

PROJECT CONTROL

Warranty

Current manufacturer warranty documentation states 5 years for the container structure and training racks, and 1 year for training equipment, subject to the final supplied configuration and warranty terms.

PROJECT CONTROL

Foundations & wind

Foundation, anchoring and wind design are project-specific. Location, local wind criteria, ground / foundation conditions, installation environment and anchoring method are required for technical review.

SUPPLY SCOPE

Made to order for the destination and training brief.

The system is supplied to order rather than stocked as a retail gym. Final equipment, branding, coating / finish, documentation, packing and freight are confirmed for the selected project.

Foundations, anchoring, local structural engineering, approvals, electrical and mechanical connections, cranage, installation and site works are excluded unless expressly included.

TORVYR · BUILT FOR THE WORK.

Build the configuration around the real site and training programme.

Project