Skip to main content
Apollo NZ GlobalSubmit RFP

TIRREN · Resort Project Centre

Coordinate the guest-facing systems by zone, schedule and release package.

TIRREN spans hospitality solid surfaces and waterfront systems. The project centre routes each zone into the right technical pathway while keeping mock-ups, drawings, quantities, packaging, staged delivery and local engineering visible.

Project conditions

Which part of the development are you coordinating?

Project release chain

Move from concept to repeatable supply without losing control.

01 · Schedule

Room/zone types, quantities, drawings, BOQ and intended use.

02 · Technical package

Material data, geometry, drawings, finishes, interfaces and evidence.

03 · Mock-up / approval

Sample, mock-up room/product or shop-drawing approval as required.

04 · Production release

Freeze dimensions, finishes, quantities, labelling and packaging.

05 · Staged logistics

Pack and release by room, floor, villa, building, zone or waterfront phase.

06 · Handover

Documentation, spares/care information and local installation/maintenance responsibilities.

Project