TIRREN · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Coordinate guestroom, bathroom, public-area, poolside and waterfront packages through room schedules, finishes, mock-ups, technical submittals, packaging, phasing and multi-room procurement.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Hotel/resort type, key count and project stage

02

Room/area schedules and quantity matrix

03

Material/finish/colour requirements

04

CAD/shop-drawing/BIM requirements

05

Mock-up room / sample / approval process

06

Wet-area, UV/coastal and cleaning-chemical exposure

07

Packaging/room-by-room labelling and site storage

08

Manufacturing/phasing/freight/installation responsibility

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Material composition/performance data

02

Finish/colour/sample approval

03

Wet-area/stain/cleaning performance where relevant

04

Exact shop drawings and production tolerances

05

Mock-up / pre-production approval record

06

Packaging/label/room schedule QA

07

Warranty, repair and replacement strategy

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Hospitality / room-package concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Room/area scope schedule

02

Material and finish performance

03

Dimensions/tolerances

04

Wet-area/environment exposure

05

Samples/mock-up approval

06

Shop drawings/BIM

07

Packaging/room labelling

08

Production/phasing/freight

09

Warranty/repair/replacement

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Key/room schedule

02

Area/package schedule

03

Drawings

04

Finish/sample schedule

05

Mock-up requirements

06

Technical evidence

07

Packing/label schedule

08

Production/phasing

09

Freight/site receiving

10

Warranty/spares

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Cleaning chemical controls

02

Surface damage/repair procedure

03

Seal/joint inspection

04

Replacement component/finish register

05

Public-area high-wear inspection

06

Wet-area maintenance

07

Room-by-room defect log

08

Spare material stock

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project