Skip to main content
Apollo NZ GlobalStart Exact Project Brief

TIRREN · SPECIFICATION STARTER

Resort Project Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

TIRREN

Resort Project Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Hotel/resort type, key count and project stage
  2. Room/area schedules and quantity matrix
  3. Material/finish/colour requirements
  4. CAD/shop-drawing/BIM requirements
  5. Mock-up room / sample / approval process
  6. Wet-area, UV/coastal and cleaning-chemical exposure
  7. Packaging/room-by-room labelling and site storage
  8. Manufacturing/phasing/freight/installation responsibility
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Room/area scope schedule
  2. Material and finish performance
  3. Dimensions/tolerances
  4. Wet-area/environment exposure
  5. Samples/mock-up approval
  6. Shop drawings/BIM
  7. Packaging/room labelling
  8. Production/phasing/freight
  9. Warranty/repair/replacement
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Material composition/performance data
  2. Finish/colour/sample approval
  3. Wet-area/stain/cleaning performance where relevant
  4. Exact shop drawings and production tolerances
  5. Mock-up / pre-production approval record
  6. Packaging/label/room schedule QA
  7. Warranty, repair and replacement strategy
04

DRAWING / CAD / BIM REGISTER

  1. Hospitality / room-package concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Key/room schedule
  2. Area/package schedule
  3. Drawings
  4. Finish/sample schedule
  5. Mock-up requirements
  6. Technical evidence
  7. Packing/label schedule
  8. Production/phasing
  9. Freight/site receiving
  10. Warranty/spares
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Cleaning chemical controls
  2. Surface damage/repair procedure
  3. Seal/joint inspection
  4. Replacement component/finish register
  5. Public-area high-wear inspection
  6. Wet-area maintenance
  7. Room-by-room defect log
  8. Spare material stock

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project