Padel
Facility Specification Pack

Padel is a structural court system, not simply a fenced playing surface. Glass, steel, mesh, turf, lighting, foundations, wind, clear height and court-bank circulation all need coordinated design.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERPadel Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

Single/community court with durable frame, glass, turf and lighting.

02Clubs · academies · universities

Club / academy

Club court bank with circulation, viewing, shade and repeat maintenance.

03Regional · national competition

Competition

Competition-oriented venue with controlled FIP geometry, lighting, player/event operations and spectator zones.

04International · professional · broadcast

Elite / major venue

Destination/major club with panoramic courts, covered play, hospitality, digital systems and professional operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Protect the 10 × 20 m court geometry, enclosure, entrances, external play zones where relevant, circulation and multi-court spacing.

02

surface

Padel-specific turf needs correct pile/infill, seams, base/drainage and maintenance; turf choice affects ball response and player movement.

03

equipment

Net/posts and enclosure components need exact geometry, glass quality, mesh and safe interfaces.

04

lighting

Integrated or external lighting must control glare through glass and provide consistent play across the full enclosure.

05

spectators

Panoramic courts support strong viewing but circulation, seating, accessible routes and hospitality must stay clear of entrances/external play.

06

structure

Steel frame, tempered glass, anchors/foundations, lighting columns, wind/seismic criteria and roof/cover interfaces require project engineering.

07

environment

Heat, UV, wind, rain, salt and thermal movement affect glass, coatings, turf and foundations. Covered facilities need ventilation/condensation planning.

08

accessibility

Provide accessible venue circulation and viewing while maintaining court entrances and safe glass/enclosure zones.

09

storage

Turf maintenance tools, nets, spare glass/hardware, furniture and event systems require operational storage.

10

technology

Booking/access, cameras, scoring, FÍSVOR, PA and digital signage can support commercial clubs.

11

evidence

Use current FIP Rules of Padel and competition documents for court/tournament requirements; exact structure/glass/lighting evidence remains project-specific.

12

lifecycle

Inspect glass, fixings, steel coating, anchors, mesh, turf/infill, lighting, net and drainage; maintain a spare-component strategy.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Court count

02

Court architecture

03

Indoor/outdoor/covered

04

Wind/seismic/site criteria

05

Foundation/base

06

Glass/enclosure

07

Turf

08

Lighting

09

External play / access

10

Spectators/hospitality

11

Commercial operations

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Court plan/elevations

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Foundation/anchor detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Glass panel schedule

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Steel/frame layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Turf/base/drainage section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Multi-court circulation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Cover interface

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Glass cleaning/inspection

02

Fasteners

03

Coating/corrosion

04

Mesh

05

Turf grooming/infill

06

Net

07

Lighting

08

Drainage

09

Spare glass/hardware

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Glass vibration/rattle

Inspect fixings, pads, frame tolerance and structural movement.

02

Turf migration/uneven bounce

Review seam, infill distribution and grooming.

03

Condensation in covered hall

Review ventilation, humidity and surface temperature.

04

Lighting reflection in glass

Review fixture aiming/position and glass sightlines.

05

Corrosion

Review coating damage, salt exposure, drainage and fasteners.

06

Door/entrance conflicts

Review court-bank circulation and external play requirements.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

FIP Documents

Current Rules of Padel, competition regulations and 2026 tour documents.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project