RAWNARA / TECHNICAL & PROCUREMENT
A responsible landmark programme needs a documented design basis, qualified manufacturing pathway and clearly allocated local project responsibilities.
PROJECT WORKFLOW
These are procurement review stages, not promises of current supplier capability.
Location, audience, intended purpose, operating life and desired visitor impression.
Site dimensions, environmental exposure, support points, accessibility and local code requirements.
Shortlist a proven manufacturer; verify size, materials, finish, segmentation and prior examples.
Review geometry, structural basis, fabrication drawings, lighting/control scope, QA and maintenance.
Agree factory acceptance, packing, shipment sequencing, lifting and receipt responsibilities.
The customer's appointed local designers, engineers and contractors own approvals, foundations, installation and commissioning as contracted.
MANDATORY PROJECT DISTINCTION
Wholesale and international project supply: scope definition, manufacturer liaison, product documentation, coordinated fabrication and shipment as agreed.
Site surveys, engineering acceptance, statutory approvals, foundations, utilities, lifting, installation, commissioning and local regulatory compliance unless otherwise expressly agreed in writing.
SUPPLIER QUALIFICATION GATE
No supplier's past projects are used in RAWNARA promotion. Each future made-to-order design must be qualified to the particular project's requirements.
ARCHITECTURAL RESOURCE LIBRARY
READY FOR PROCUREMENT REVIEW
Organise project information into a structured schedule before engaging the appropriate fabrication partner.
Open project brief builder