Skip to main content
Apollo NZ Global

Global projects / Malaysia / Project package

Sports-facility supply planned around tropical exposure and intensive year-round use.

This package is for Malaysian clubs, schools, developers, resorts and recreation operators planning courts, halls, padel, training or venue systems in a hot, humid, high-rainfall environment.

Build Malaysia sports facility brief

Sports clubs and academies

Schools and universities

Developers and resorts

Consultants, contractors and operators

Apollo is supply-only. Local design, engineering, approvals, construction, installation and commissioning remain with the appropriate project parties unless a specific support item is expressly included in the agreed supply scope.

Package scope

Systems that can be coordinated around one project brief.

Project interfaces

Resolve the boundaries before procurement.

01

Heat and humidity

Surfaces, metals, electronics, ventilation and cleaning/storage need high-humidity planning.

02

Tropical rainfall

Court drainage, roofs, gutters, downpipes, thresholds and spectator routes should be coordinated early.

03

Covered / semi-outdoor transition

Wind-driven rain, condensation and ventilation can affect areas that look protected on plan.

04

Year-round use

Maintenance frequency, wear components, storage and spares should reflect intensive operating programmes.

Procurement sequence

Move from brief to a controlled supply package.

01

Confirm sport and exposure

Define indoor, outdoor and covered areas, users, operating hours and site conditions.

02

Resolve water and climate interfaces

Coordinate drainage, cover, ventilation and material exposure before product freeze.

03

Build complete facility scope

Connect courts/halls with lighting, spectators, display, training and operations.

04

Freeze supply, freight and lifecycle

Confirm documents, quantities, packing, receiving, spares and maintenance information.

What to send

Information needed for a meaningful package review.

01

State / city and project

02

Sports and facility type

03

Indoor / outdoor / covered

04

Site / building drawings

05

Heat / humidity conditions

06

Rainfall / drainage

07

Lighting / display

08

Spectator / storage

09

Local design / contractor team

10

Delivery programme

Scope boundary

Items not automatically included in Apollo's supply package.

Local engineering and statutory approvals

Civil, drainage and foundation works

Local electrical design / installation

Local installation labour unless separately agreed

Ongoing facility management

Next step

Send the actual project, not a generic shopping list.

The fastest route is to include the current drawings, quantities, destination, project stage and technical requirements so Apollo can separate product supply, documentation, freight and destination responsibilities.

Build Malaysia sports facility brief
Project