Global projects / Malaysia / Project package
Sports-facility supply planned around tropical exposure and intensive year-round use.
This package is for Malaysian clubs, schools, developers, resorts and recreation operators planning courts, halls, padel, training or venue systems in a hot, humid, high-rainfall environment.
Schools and universities
Developers and resorts
Consultants, contractors and operators
Apollo is supply-only. Local design, engineering, approvals, construction, installation and commissioning remain with the appropriate project parties unless a specific support item is expressly included in the agreed supply scope.
Package scope
Systems that can be coordinated around one project brief.
Court sports
Padel, pickleball, tennis, basketball and multi-sport courts coordinated around drainage, heat, lighting and user flow.
Explore system →Package systemIndoor halls
Badminton, basketball, volleyball, futsal and shared-use halls coordinated around flooring, HVAC, lighting and storage.
Explore system →Package systemSpectator infrastructure
Bleachers, retractable seating and grandstands reviewed around humidity, weather protection and configured capacity.
Explore system →Package systemLighting & technology
Lighting, FÍSVOR, scoring and cameras with humid-environment, enclosure and maintenance review.
Explore system →Package systemStructures & covers
Court covers and sports structures coordinated around heavy rainfall, drainage and site-specific wind design.
Explore system →Package systemOperations
Maintenance and lifecycle planning for high-use year-round facilities.
Explore system →Project interfaces
Resolve the boundaries before procurement.
Heat and humidity
Surfaces, metals, electronics, ventilation and cleaning/storage need high-humidity planning.
Tropical rainfall
Court drainage, roofs, gutters, downpipes, thresholds and spectator routes should be coordinated early.
Covered / semi-outdoor transition
Wind-driven rain, condensation and ventilation can affect areas that look protected on plan.
Year-round use
Maintenance frequency, wear components, storage and spares should reflect intensive operating programmes.
Procurement sequence
Move from brief to a controlled supply package.
Confirm sport and exposure
Define indoor, outdoor and covered areas, users, operating hours and site conditions.
Resolve water and climate interfaces
Coordinate drainage, cover, ventilation and material exposure before product freeze.
Build complete facility scope
Connect courts/halls with lighting, spectators, display, training and operations.
Freeze supply, freight and lifecycle
Confirm documents, quantities, packing, receiving, spares and maintenance information.
What to send
Information needed for a meaningful package review.
State / city and project
Sports and facility type
Indoor / outdoor / covered
Site / building drawings
Heat / humidity conditions
Rainfall / drainage
Lighting / display
Spectator / storage
Local design / contractor team
Delivery programme
Scope boundary
Items not automatically included in Apollo's supply package.
Local engineering and statutory approvals
Civil, drainage and foundation works
Local electrical design / installation
Local installation labour unless separately agreed
Ongoing facility management
Next step
Send the actual project, not a generic shopping list.
The fastest route is to include the current drawings, quantities, destination, project stage and technical requirements so Apollo can separate product supply, documentation, freight and destination responsibilities.
Build Malaysia sports facility brief