Skip to main content
Apollo NZ GlobalStart project brief
CIVARO Hydration

CIVARO Hydration · bottle filling

CIVARO FILL 01

A dedicated refill point with integrated drinking-water capability.

A freestanding stainless-steel bottle-filling and drinking station for schools, sports facilities, workplaces, transport environments and high-use public projects.

Product-specific technical page. Published dimensions and material data reflect the current product information; project options are confirmed for the selected configuration.
Factory product reference for a stainless-steel pedestal bottle-filling and drinking station
CIV-F01Bottle filling + drinking stationWholesale & project supply
01Bottle filling
02Drinking fountain
03Filtration shown in factory configuration
04Cooling / heating module shown as an option

Technical data

Current product information for project planning.

These values come from the current product documentation. Performance and compliance claims remain specific to the selected model, components and destination.

Material
304 stainless steel
Factory dimensions
470 × 410 × 970 mm
Surface
Hairline brushed
Functions
Bottle filling + drinking fountain
Reference accessories
Waste · push-button bubbler · gooseneck bubbler · filtration
Factory cooling reference
8–15°C cold-water outletCatalogue cooling module; destination electrical configuration must be confirmed.
Factory inlet-pressure reference
0.2–0.4 MPaShown for the catalogue cooling/heating configuration.

Applications

Where FILL 01 fits.

Application suitability still depends on site exposure, user profile, services, drainage, maintenance access and local project requirements.

01

Schools + campuses

02

Sports facilities

03

Public buildings

04

Transport environments

05

Workplaces

06

Recreation centres

Project options

Configure the station around the site requirements.

These options are not blanket standard inclusions. Apollo confirms the available configuration for the selected station before quotation.

  • Ambient configuration
  • Filtered configuration
  • Chilled configuration
  • Filtered + chilled configuration
  • Sensor-operated bottle filling
  • 316 / 316L coastal specification

Project checks

Confirm the details that depend on the final configuration.

The selected product is finalised only after the relevant site, services, material, compliance and installation requirements have been confirmed.

01

50 Hz destination electrical option

02

Exact filter model + cartridge details

03

Model-specific NSF / WRAS evidence

04

Water flow rate

05

Waste + service-access detail

06

316 / 316L component schedule

Compliance boundary. Accessibility, potable-water, sanitary, electrical, corrosion and coastal claims are only applied where the exact product or component evidence supports them for the destination project.

Project responsibilities

APOLLO / CIVARO

Project supply

Product selection, technical coordination, documented product specification and supply of the selected equipment package.

LOCAL PROJECT TEAM

Site + installation

Local plumbing, drainage, foundations, electrical works where required, installation, approvals and destination-specific compliance remain project responsibilities unless expressly included.

CIVARO Hydration · project supply

Brief the site before locking the configuration.

Tell us the project location, application, expected users, exposure, accessibility requirements, water services and quantity.

Start CIVARO project brief sales@apollonzglobal.com

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Apollo NZ Global

CIVARO Hydration · architectural drinking-water infrastructure for public projects.

Hydration range
Project