Skip to main content
Apollo NZ GlobalStart project brief
CIVARO Hydration

CIVARO Hydration · accessible configuration

CIVARO ACCESS 01

A compact public fountain built around wheelchair-accessible use.

A stainless-steel drinking fountain platform intended for accessible public environments. The factory describes the reference configuration as ADA-compliant; final compliance remains subject to the applicable project and jurisdiction.

Product-specific technical page. Published dimensions and material data reflect the current product information; project options are confirmed for the selected configuration.
Factory product reference for a wheelchair-accessible stainless-steel public drinking fountain
CIV-A01Accessible public drinking fountainWholesale & project supply
01Wheelchair-accessible form
02Wall-side / pedestal-style geometry
03Compact projection
04Stainless-steel construction

Technical data

Current product information for project planning.

These values come from the current product documentation. Performance and compliance claims remain specific to the selected model, components and destination.

Material
Bacteriostatic 304 stainless steelSupplier catalogue wording.
Material thickness
1.2 mm
Surface
Hairline finished
Factory dimensions
770 × 254 × 830 mm
Reference fittings
Bubbler tap + 1.5 in waste
Factory accessibility description
ADA-compliant wheelchair-accessible drinking fountainThis does not establish NZS 4121 or AS 1428 compliance.

Applications

Where ACCESS 01 fits.

Application suitability still depends on site exposure, user profile, services, drainage, maintenance access and local project requirements.

01

Civic buildings

02

Parks + reserves

03

Schools + campuses

04

Recreation centres

05

Sports facilities

06

Transport + public amenities

Project options

Configure the station around the site requirements.

These options are not blanket standard inclusions. Apollo confirms the available configuration for the selected station before quotation.

  • Alternative activation hardware
  • Bottle-filling companion configuration
  • Project-specific mounting / service coordination
  • Filtered-water option
  • 316 / 316L coastal specification

Project checks

Confirm the details that depend on the final configuration.

The selected product is finalised only after the relevant site, services, material, compliance and installation requirements have been confirmed.

01

NZS 4121 / AS 1428 dimensional review where required

02

Operating force + reach-range data

03

Knee / toe clearance confirmation

04

Water inlet + pressure data

05

Fixing / mounting detail

06

Model-specific drinking-water certification

07

316 / 316L component schedule for coastal projects

Compliance boundary. Accessibility, potable-water, sanitary, electrical, corrosion and coastal claims are only applied where the exact product or component evidence supports them for the destination project.

Project responsibilities

APOLLO / CIVARO

Project supply

Product selection, technical coordination, documented product specification and supply of the selected equipment package.

LOCAL PROJECT TEAM

Site + installation

Local plumbing, drainage, foundations, electrical works where required, installation, approvals and destination-specific compliance remain project responsibilities unless expressly included.

CIVARO Hydration · project supply

Brief the site before locking the configuration.

Tell us the project location, application, expected users, exposure, accessibility requirements, water services and quantity.

Start CIVARO project brief sales@apollonzglobal.com

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Apollo NZ Global

CIVARO Hydration · architectural drinking-water infrastructure for public projects.

Hydration range
Project