Opening width/drop, quantity and surrounding structure
VELARIS + LUNVIQ · PROJECT AUTHORITY CENTRE
Move from product interest to a controlled project specification.
Coordinate guided outdoor blinds and roller-screen systems around opening geometry, fabric outcome, wind exposure, cassette/track class, controls, smart integration, fixing substrate, coastal conditions and severe-weather operation.
01 · PROJECT INPUTS
Define the conditions before the exact system is released.
These inputs are deliberately upstream of model selection so the product does not dictate the brief.
Residential, hospitality, commercial or project use
Shade, glare, privacy, airflow, clear-view or blockout objective
Mesh, clear-PVC, blockout or dual-layer pathway
Manual, motorised, hybrid or smart-control requirement
Wind exposure, severe-weather procedure and coastal/salt condition
Cassette/track/fixing substrate and reveal/face-fit geometry
Power, controls, sensors, access, cleaning and maintenance requirements
02 · EVIDENCE CONTROL
Keep project claims attached to what the evidence actually proves.
Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.
Exact model size/area limits
Fabric openness/material and UV/weather evidence
Motor/control/sensor documentation
Exact wind guidance tied to model, fabric and opening
Cassette, guide and fixing information
Coating/corrosion suitability for destination exposure
Warranty, manuals, spare components and maintenance requirements
03 · CAD / DRAWING REGISTER
Planning references are not exact-system construction drawings.
Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.
| Resource | Status | Purpose |
|---|---|---|
| Blind / roller screen concept / planning layout | Public planning | Early scope, interface and consultant coordination only. |
| Generic technical reference / typical detail | Public planning | Explains system logic without representing an exact supplied configuration. |
| Exact-system GA / dimensional drawing | Exact-system | Issued only after the quoted system/configuration is known. |
| Native CAD / DWG / DXF | Verify availability | Availability and revision must be confirmed against the exact supplied system. |
| BIM / Revit / IFC object | Verify availability | Only described as BIM where a genuine verified native model exists. |
| Foundation / fixing / setting-out drawing | Project-specific | Depends on site/building conditions, local engineering and the selected system. |
| Services / electrical / controls interface | Project-specific | Coordinates the supplied system with local power, data, water, drainage or controls. |
04 · SPECIFICATION STARTER
Write the project around performance, interfaces and evidence.
These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.
Opening schedule and mounting condition
Blind/screen family and cassette class
Fabric outcome and openness/material
Controls / motor / sensor pathway
Wind/severe-weather operating requirements
Coastal/environment requirements
Fixing/substrate interface
Electrical/control responsibilities
Maintenance and warranty
05 · TENDER / RFP SCHEDULE
Ask bidders for the same controlled information.
A consistent schedule makes technical comparison easier and reduces hidden assumptions.
Opening schedule
Desired outcome by opening
Fabric schedule
Operation/control schedule
Exposure/wind/coastal information
Fixing substrate
Power/control requirements
Evidence and drawing requirements
Warranty/spares/maintenance
06 · OPERATIONS & HANDOVER
Specify how the system will be maintained after delivery.
Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.
Track/guide cleaning
Fabric cleaning and inspection
Cassette/bottom-rail inspection
Motor/control/sensor test
Post-storm inspection
Coastal fresh-water rinse
Fastener/fixing visual inspection
Spare motor/control/fabric pathway
DOWNLOADABLE PROJECT RESOURCE
Carry the authority pack into the project file.
Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.