Skip to main content
Apollo NZ GlobalStart Exact Project Brief

VELARIS + LUNVIQ · SPECIFICATION STARTER

Outdoor Blind & Roller Screen Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

VELARIS + LUNVIQ

Outdoor Blind & Roller Screen Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Opening width/drop, quantity and surrounding structure
  2. Residential, hospitality, commercial or project use
  3. Shade, glare, privacy, airflow, clear-view or blockout objective
  4. Mesh, clear-PVC, blockout or dual-layer pathway
  5. Manual, motorised, hybrid or smart-control requirement
  6. Wind exposure, severe-weather procedure and coastal/salt condition
  7. Cassette/track/fixing substrate and reveal/face-fit geometry
  8. Power, controls, sensors, access, cleaning and maintenance requirements
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Opening schedule and mounting condition
  2. Blind/screen family and cassette class
  3. Fabric outcome and openness/material
  4. Controls / motor / sensor pathway
  5. Wind/severe-weather operating requirements
  6. Coastal/environment requirements
  7. Fixing/substrate interface
  8. Electrical/control responsibilities
  9. Maintenance and warranty
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact model size/area limits
  2. Fabric openness/material and UV/weather evidence
  3. Motor/control/sensor documentation
  4. Exact wind guidance tied to model, fabric and opening
  5. Cassette, guide and fixing information
  6. Coating/corrosion suitability for destination exposure
  7. Warranty, manuals, spare components and maintenance requirements
04

DRAWING / CAD / BIM REGISTER

  1. Blind / roller screen concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Opening schedule
  2. Desired outcome by opening
  3. Fabric schedule
  4. Operation/control schedule
  5. Exposure/wind/coastal information
  6. Fixing substrate
  7. Power/control requirements
  8. Evidence and drawing requirements
  9. Warranty/spares/maintenance
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Track/guide cleaning
  2. Fabric cleaning and inspection
  3. Cassette/bottom-rail inspection
  4. Motor/control/sensor test
  5. Post-storm inspection
  6. Coastal fresh-water rinse
  7. Fastener/fixing visual inspection
  8. Spare motor/control/fabric pathway

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project