Competition / Level 1
A current Level 1 mobile backstop route is verified in the official FIBA catalogue. The primary package includes a 3x3 timing pathway; exact technical, logistics and power detail is closed against the selected quotation.
Project BriefKNOTTR EVIDENCE CONTROL
This register shows the evidence state without exposing upstream sourcing. Exact manufacturer, product and licence evidence is held against the quotation where approval is required.
PLANNING REFERENCE
This page answers one narrow planning question. Use the Technical Centre and Project Brief for the complete 3x3 system.
A current Level 1 mobile backstop route is verified in the official FIBA catalogue. The primary package includes a 3x3 timing pathway; exact technical, logistics and power detail is closed against the selected quotation.
A second current Level 1 mobile backstop route is verified. Timing configuration is not assumed to be identical to the primary route and is checked before release.
A current Level 2 mobile backstop route is verified. Any timing/scoring beyond the selected equipment package is confirmed specifically for 3x3.
Technical dimensions, ballast/operating envelope, corrosion/maintenance, packing, spares, warranty, permitted branding and 2027 approval renewal remain controlled quotation-stage checks where not already supplied.
PROJECT CHECK
Recheck official approval at quotation
Record exact product + licence internally
Attach current certificate / listing evidence
Close technical and logistics pack
Refresh approval evidence for projects extending into a new licence year
CONTINUE THE KNOTTR PATHWAY
Current FIBA 3x3 backstop catalogue rechecked 5 October 2026. Approval remains exact-product and competition-level specific.
WHOLESALE & PROJECT SUPPLY
Apollo is supply-only. Final survey, civil works, foundations, electrical work, installation, statutory approvals and professional sign-off remain destination-project responsibilities unless expressly included.