Skip to main content
Apollo NZ Global3x3 Project Brief
CORE PRODUCT · 3x3 BASKETBALL

FIBA-LED SURFACE PATHWAY

Competition 3x3

Competition 3x3 built around the approved playing surface first.

For clubs, academies and tournament projects where competition-grade 3x3 performance is the starting point. Apollo builds the project around the selected current FIBA Level 1 approved 3x3 / outdoor source system, then coordinates the equipment and venue interfaces around it.

BEST FIT

Competition courtsBasketball clubsAcademiesTournament venuesUniversitiesInternational projects

Global supply-only project pathway. Local civil works, installation and approvals remain destination-specific unless expressly included.

PLAYING SURFACE

ATHREN C3 Competition

Dedicated competition modular pathway using the selected current FIBA Level 1 approved 3x3 / outdoor source system. Current source families include resilient TPE and modified-PP competition systems.

Explore surface system

Current FIBA Level 1 approved 3x3 / outdoor source-system pathway

OEM/private-label supply confirmed

Portable modular competition pathway

Project-specific certificate mapping retained internally

PROJECT SCOPE

What the package means — and what stays project-specific.

APOLLO PACKAGE PATHWAY

Coordinate from one brief

Competition surface pathway

Court colour / graphic direction

Basketball equipment coordination

Shot-clock / scoreboard requirements review

Lighting interface

Containment and circulation review

CONFIRMED PER PROJECT

Do not assume these items

Exact hoop / backstop model

Shot clock and scoreboard model

Electrical package

Civil / base works

Installation

Local approvals and competition sign-off

WHAT WE NEED

Quote-ready project inputs.

The more of these are resolved at the beginning, the less rework is needed when the exact surface, equipment and freight package are selected.

01Competition level
02Court count
03Overall site dimensions
04Base condition and flatness
05Indoor / outdoor / covered environment
06Equipment and event requirements
07Destination and target timing

CONNECTED PATHWAYS

Move up, down or sideways without restarting the project.

Portable event pathwayMove from permanent competition use to repeated tournament and activation deployment.Premium architectural courtUse a timber-look bio-composite pathway where visual character is part of the brief.3x3 Project BriefTurn the competition brief into a structured Apollo review.

READY TO STRUCTURE IT?

Build the 3x3 brief around the site and operating model.

Start 3x3 Project Brief
Apollo NZ Global

Apollo NZ Global is supply-only. Final site design, foundations, engineering, electrical work, installation and statutory requirements remain project-specific.

sales@apollonzglobal.com
Project