PROJECT DECISIONS
Resolve the interfaces that control the system.
The product comes after the operating brief. Building structure, surface, movement routes, services and maintenance access can all change the correct system.
01Underlying surface
Identify natural grass, hybrid turf, synthetic turf, athletics track, timber sports floor or resilient floor before selecting the protection system.
02Event load map
Separate spectators, temporary seating, staging, service routes and any vehicle movements so each zone has the correct protection class.
03Covering duration
Set installation time, event duration and removal window. Live turf can be damaged by heat, moisture, reduced light and restricted airflow even without excessive structural load.
04Drainage & ventilation
Plan water movement, airflow and any irrigation / turf-management requirements during the covered period rather than treating the flooring as a sealed overlay.
05Movement & joints
Define locking, edge ramps, cable crossings, transitions, turning zones and removal sequence to avoid panel movement or local overload.
06Recovery plan
Agree post-event removal, inspection, cleaning, turf grooming/repair, watering, field testing and return-to-play responsibilities before the event.