Skip to main content
Apollo NZ Global

LUTHVAR · GLOBAL SPORTS TECHNICAL LIBRARY

Rugby
Facility Specification Pack

Rugby facility design has to account for contact, surface impact performance, post systems, field-edge safety and heavy training use. This centre keeps laboratory product evidence separate from testing of the finished installed field.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERRugby Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

Participation field with safe posts/padding, durable surface and community lighting.

02Clubs · academies · universities

Club / academy

Club venue with repeat training/match use, team areas, spectators and stronger maintenance.

03Regional · national competition

Competition

Regional competition with controlled surface evidence, lighting, grandstand and event systems.

04International · professional · broadcast

Elite / major venue

Professional/elite venue with high-performance surface, broadcast lighting, major spectators, medical/player and media operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Field, in-goal, run-off, technical areas and post locations must match the applicable rugby code/competition requirements and local venue conditions.

02

surface

Natural and synthetic rugby systems need contact/impact performance, traction, drainage and maintenance matched to player level and use intensity.

03

equipment

Posts, sleeves/foundations, padding, flags and team shelters must be selected and inspected as exact systems.

04

lighting

Training-to-broadcast lighting needs photometric design, glare/spill control and structural/electrical coordination.

05

spectators

Keep viewing, barriers, grandstands and accessible routes outside the field safety envelope while maintaining team/medical access.

06

structure

Posts, containment, floodlights, scoreboards, covers, grandstands and buildings all need site-specific loads/foundations.

07

environment

Rainfall, heat, frost, coastal exposure and field use affect drainage, turf choice and maintenance.

08

accessibility

Coordinate accessible spectator positions, amenities and precinct circulation with emergency/medical access.

09

storage

Training gear, post pads, maintenance machinery and event equipment need secure, direct field access.

10

technology

FÍSVOR scoring/video, PA, cameras and performance analysis should be coordinated with sightlines, power/data and operator positions.

11

evidence

World Rugby Regulation 22 distinguishes laboratory tests from field tests of the installed Rugby Turf surface; project claims should preserve that distinction.

12

lifecycle

Surface grooming/agronomy, impact/performance testing, post and pad inspection, lighting, drainage and spectator assets require planned maintenance.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Rugby code / competition level

02

Field and in-goal geometry

03

Natural / synthetic pathway

04

Use intensity

05

Impact/certification target

06

Drainage

07

Posts/padding

08

Lighting

09

Spectators / covers

10

Team / medical / performance areas

11

Maintenance capability

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Field/run-off plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Surface/base/drainage section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Post foundation detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Team/technical/medical areas

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Spectator/cover plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Maintenance access

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Surface programme

02

Impact/performance monitoring

03

Drainage

04

Posts/pads

05

Line marking

06

Lighting

07

Dugouts/team areas

08

Grandstand/cover checks

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Hard/unsafe artificial surface

Review infill/shock system, maintenance and current field test results.

02

Surface migration / seam issue

Inspect joins, infill distribution and local movement.

03

Post movement

Inspect sleeves/foundations and hardware.

04

Wet field closure

Review drainage, compaction and maintenance practices.

05

High-wear contact zones

Increase maintenance/repair and review use pattern.

06

Spectator barrier too close

Recheck run-off/safety envelope and local competition requirements.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

World Rugby Regulation 22

Official standard relating to Rugby Turf, including separate laboratory and installed-field testing concepts.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project