Sport Climbing
Facility Specification Pack

Climbing facilities are safety-led structures. Wall geometry, anchors, impact systems, auto-belay, speed equipment, routesetting access, inspection and rescue/operations must be designed together.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERSport Climbing Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/community movement and bouldering with supervision-led design.

02Clubs · academies · universities

Club / academy

Club wall with broader boulder/rope training, routesetting and operational systems.

03Regional · national competition

Competition

Competition-capable facility with exact wall/equipment, officials and spectator zones.

04International · professional · broadcast

Elite / major venue

Major event/elite centre with recognised speed systems, lead/boulder competition walls, media and event operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Separate boulder, lead and speed volumes, fall zones, rope paths, route access and spectator/official areas.

02

surface

Wall panels/texture and impact flooring/mats are independent safety systems that must be matched to discipline and fall characteristics.

03

equipment

Holds, volumes, anchors, quickdraws, auto-belays, timing and speed systems need exact inspection/certification pathways.

04

lighting

Provide even route visibility without glare to climbers, judges or cameras.

05

spectators

Keep spectators out of fall zones and routesetting/technical access while preserving views.

06

structure

Wall primary structure, panels, anchors, loads and building interfaces require specialist engineering.

07

environment

Indoor humidity/temperature and outdoor sun/rain/wind affect wall materials, holds and operations.

08

accessibility

Inclusive climbing, spectator access and adaptive equipment/route programmes should be planned where relevant.

09

storage

Holds, volumes, ropes, routesetting tools, lifts, mats and maintenance gear need organised secure storage.

10

technology

Speed timing, scoring, cameras, displays and event systems require exact alignment, power and data.

11

evidence

World Climbing uses strict equipment requirements for Speed walls, holds, timing and auto-belay; exact recognised equipment matters.

12

lifecycle

Formal inspections of structure, panels, anchors, holds, belays, mats, timing and routesetting hardware are essential.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Disciplines

02

Wall heights/widths

03

Competition target

04

Primary structure

05

Fall/impact system

06

Belay/auto-belay

07

Routesetting access

08

Lighting

09

Spectators

10

Timing/display

11

Inspection/operations

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Wall elevations/sections

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Primary structure/load plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Fall-zone plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Impact-floor detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Belay/anchor schedule

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Speed timing layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Spectator separation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Routesetting access

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Daily visual checks

02

Hold/volume inspection

03

Torque/fastener checks

04

Anchor/belay inspection

05

Mat/impact inspection

06

Timing test

07

Deep structural inspection

08

Routesetting equipment

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Loose/spinning holds

Inspect fixing, panel insert and torque.

02

Mat gaps

Review fit, movement and edge restraint.

03

Auto-belay fault

Remove from service and follow manufacturer inspection/service process.

04

Timing inconsistency

Check sensor alignment, cable/data and calibration.

05

Wall flex/damage

Close area and obtain structural inspection.

06

Spectators enter fall zone

Improve barriers, circulation and operating controls.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

World Climbing Sport Equipment

Recognised Speed walls, holds, automatic timing and auto-belay equipment.

World Climbing Competition Resources

Current competition rules, event regulations and equipment code.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project