Beach volleyball is a sand-performance system, not simply volleyball outdoors. Court geometry, sand depth/quality, drainage, net/post anchoring, free zones, lighting, event barriers and spectator conditions all affect the facility.
PROJECT INTENT
Community sand court with safe posts, appropriate sand and practical drainage.
Club/resort venue with multiple courts, lighting, shade and spectator/social areas.
Competition court with controlled sand, free zones, net system, officials and event infrastructure.
FIVB-style major event pathway with larger free zone/clear space, show court, spectators, lighting and media.
TECHNICAL REQUIREMENTS
The FIVB beach-volleyball court is 16 × 8 m with a minimum 3 m general free zone; higher official competitions use larger free zones.
Use level, uniform, hazard-free sand with suitable grading/depth and drainage. FIVB official competitions require at least 40 cm sand depth.
Posts, net, antennae, boundary lines and anchors must be safe around bare-foot play and event movement.
Night competition requires strong uniform lighting and glare control; FIVB official competition guidance includes 1,000–1,500 lux measured at 1 m.
Keep barriers, seating, officials and fan zones outside the required free zone and maintain safe sand access.
Post foundations/anchors, lighting, shade, temporary event structures and displays need project-specific wind/structural design.
Wind, heat, UV, rain and sand movement are primary operational inputs; drainage and windblown sand management matter.
Provide accessible spectator and venue circulation; sand access itself may require defined inclusive routes/solutions.
Nets, lines, referee equipment, rakes, covers and event barriers need dry, secure storage.
Scoreboards, PA, FÍSVOR, cameras and temporary-event power/data should be planned around glare, wind and crowd circulation.
Use the current FIVB Beach Volleyball Rules for court/free-space/equipment requirements; exact product and local structural evidence remain separate.
Rake/screen/top-up sand, inspect anchors/posts/nets/lines, manage drainage, clean lighting/displays and maintain event barriers.
PROJECT INPUT SCHEDULE
Court count
Competition level
Sand specification/depth
Drainage
Post / anchor system
Net / lines
Free zone
Lighting
Shade / spectator zones
Wind exposure
Event technology
DRAWING & SUBMITTAL ROADMAP
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
EVIDENCE & RELEASE
Defines sport or competition requirements. It does not approve a supplier or local construction detail.
Testing, approval, certification or manufacturer evidence must match the selected product/configuration.
Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.
Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.
Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.
MAINTENANCE & HANDOVER
Sand raking/sifting
Sand top-up
Drainage
Posts/anchors
Nets/lines
Lighting
Event barriers/technology
TECHNICAL RISK CHECK
Review grading, contamination, moisture and maintenance.
Review drainage layer, outlets and site levels.
Inspect anchors/foundations and sand condition.
Review wind exposure, perimeter treatment and maintenance.
Review fixture aiming and mounting positions.
Recheck barriers, seating, officials and event equipment against current rules.
PRIMARY GOVERNING REFERENCES
Current beach-volleyball rules covering 16 × 8 m court, free zones, clear space, sand, lighting, net and posts.
SUPPLY BOUNDARY
Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.