
COMPLETE FACILITY PROJECT BRIEF
ATHREN · COMPLETE SPORTS SURFACES
Define the facility before we freeze the supply package.
Use one structured brief for the programme, site, capacity and systems Apollo should coordinate.
ATHREN · COMPLETE SPORTS SURFACES · PROJECT BRIEF
Define the facility before we freeze the products.
This brief creates a structured project scope. It does not generate automatic pricing, engineering or certification.
BRIEF PREVIEW
What Apollo receives.
LUTHVAR FACILITY PROGRAMME PROJECT BRIEF Programme: Select the surface as part of the complete sport system, not by material name alone. Package pathway: Community Surface Client / organisation: Not supplied Destination: Not supplied Project stage: Early feasibility Site / available area: Not supplied Use / competition / programme level: Not supplied Peak users / participants: Not supplied Spectator / visitor capacity: Not supplied Climate / exposure: Standard temperate Existing infrastructure / interfaces: None supplied Target timing: Not supplied Requested system layers: 01 — Court Surfaces (ATHREN COURT) 02 — Synthetic Fields (ATHREN FIELD) 03 — Athletics (ATHREN / specialist) 04 — Indoor Sports Floors (ATHREN COURT) 05 — Gym / Strength Floors (ATHREN MOVE) 06 — Shock Pads / Underlays (ATHREN) 07 — Temporary / Event Floors (ATHREN) 08 — Testing / Maintenance (ATHREN + accredited partners) Additional notes: None supplied Apollo review required before quotation: exact programme and governing-body requirements where applicable; geometry and clearances; product/system evidence; local structural/civil/electrical/fire/accessibility/building responsibilities; freight, unloading, installation, testing, commissioning and handover scope.
