Deployed envelope
Maximum platform projection, seating risers, aisle and stair positions, front clearance and safe access
LUTHVAR · SPACE PLANNING
Start with the usable room geometry, then confirm the actual manufacturer's open and stored dimensions, access and safety requirements. Available floor depth alone does not determine row count.
Enter your available frontage and depth to create a descriptive brief. This is not a seat-capacity calculator and does not determine safe row count or compliance.
Maximum platform projection, seating risers, aisle and stair positions, front clearance and safe access
Stacked depth and height, structural clearances, stored access and circulation
Target capacity, sightlines, individual seat width, aisle count, escape routes and accessible/companion positions
Floor support, anchorage, levels, wall/column obstructions and potential mechanical/electrical interfaces
Frequency of changeover, manual or powered movement, trained operators, barriers and maintenance access
Destination-specific fire, accessibility, spectator safety and structural requirements verified by the project team
The manufacturer needs a dimensioned layout to establish the actual open and stored footprint. The stated 5 m may or may not accommodate desired seating rows after platform geometry, aisles, access and operating clearances are considered. Request more than one feasible configuration where appropriate; do not promise a row count or spectator capacity before the manufacturer reviews the space.
If the project is on an existing concrete court, confirm the slab condition and site engineering responsibilities before proposing loading or fixings.
All examples are preliminary project-planning information, not manufacturer geometry, code-compliant drawings, structural certification or capacity approvals. Apollo NZ Global is a supply-only wholesaler; local installation and approvals are the responsibility of the appointed project team.
Send a floor plan, photographs, available frontage and depth, required audience capacity, access requirements and preferred operating method.