These are preparation prompts, not mandatory documentation already held by Apollo.
Information to provide
0 of 5 items reviewed
Documents to confirm with supplier
- Coordinated seating, roof and column layout
- Project load criteria and structural evidence
- Roof drainage and material specifications
- Foundation interfaces, fabrication and assembly documentation
Availability, certification, model-specific tests and drawing issue status must be established through supplier review. Project authorities determine required approvals.
What to send Apollo
Provide your venue drawings or sketch, images, expected spectator capacity, project location and destination country, delivery timeframe and the selected product category. Confirm if the deadline means arrival at port, site delivery or completion of locally arranged installation.
Apollo NZ Global is a supply-only wholesaler. The local project team is responsible for installation, engineering approval and statutory compliance.