Skip to main content
Apollo NZ GlobalStart Venue Brief

LUTHVAR · SPECTATOR PLANNING CENTRE

Capacity is a geometry problem before it becomes a seat count.

Use this centre to test early row count, seat-centre, row-depth and footprint assumptions, then work through sightlines, accessibility, egress, structure, covers and operations before the exact spectator system is released.

CONCEPT CAPACITY CALCULATOR

Expose the assumptions behind the stand.

83seats / row concept
44.5 mapprox. row length
9.6 mapprox. seating depth
3.3 mconcept total rise
427 m²seating rectangle concept

Not an egress, accessibility, sightline, guard, structural or code-compliance calculation. Final configured capacity is determined by the project layout and local professional review.

SIGHTLINE INPUT CHECK

Do not choose the rake before the focal point is known.

Good spectator geometry requires a project-specific section through the actual field/court/stage, barrier, first row and seating bowl. These are the inputs the project team should close.

PLAYING / FOCAL ZONESIGHTLINES TO DEFINED FOCAL POINTConcept only · row depth, riser, eye position, focal point, guards and obstructions require project-specific calculation.
01

Defined focal point / activity area

02

First-row eye position

03

Row depth

04

Riser height

05

Seat/eye offset

06

Barrier / guard geometry

07

Standing spectators / front-row conditions

08

Accessible viewing positions

09

Canopy columns / roof edges

10

Displays / cameras / railings

SYSTEM-SPECIFIC CHECKS

Steel grandstand

01

Confirm the focal point and spectator eye line before selecting rake/riser geometry.

02

Coordinate aisles, vomitories, stairs, guards, handrails, accessible routes and companion seating with the destination code and appointed designer.

03

Capacity follows the configured seating layout; nominal seat count is not a substitute for an egress/accessibility review.

04

Foundations, reactions and structural design remain project-specific.

SPECTATOR WORKFLOW

Capacity → sightlines → access → structure → exact system.

That order is deliberate. Selecting a seat or grandstand family before the geometry is understood creates rework.

01

Venue + target capacity

02

Focal point + sightline section

03

Rows / aisles / accessible positions

04

Egress + circulation review

05

Structure / foundations / covers

06

Exact seat / stand / retractable system

07

Submittals, installation boundary + handover

CONTINUE

Take the concept geometry into the Spectator Technical Centre.

Then close exact product evidence, local structural/access requirements, drawings, freight, installation responsibilities, maintenance and spares.

Open Spectator Technical Centre
Project